Helping 321 households from Binh Duong,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 321 households from Binh Duong,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2009 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2009 Preparation Phase

Helping 321 households from Binh Duong,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 321 households from Binh Duong,Thang Binh in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 3000

People Getting Safe Drinking Water: 3000

321.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 18016
Comments on Status: Non operational
Comments on Solutions:
Notes: Good
Cost in Local Currency: 1140682500

Funding

funded:
$53,055
Final Cost:
$53,055
edit $53,055:
GPOBA

Plan/Proposal