Providing drinking water to Morewadi, the hamlet of the main village Kerul. We have implemented a water system allowing the village access to a safe water supply and help build capacity of villagers to sustain their own watershed development.

Narrative

Since the village is situated at a higher elevation there was no permanent source of water in the village. Therefore the old community well which is located at 600 mtrs dist of the village was identified as a village source. Repairs were done to the well. A 5HP electric pump has been installed to lift the water and to store in newly constructed storage tank of 20,000 ltrs capacity and another storage tank of 2000 ltrs capacity. A pipeline of 860 mtr has been connected to drinking water tank and a pipeline of 460 mtrs has been laid down for the distribution of water. The individual tap connections have been provided to all the households.

Earlier the drinking water was provided through the tankers during the summer and now due to the implementation of the project, all the household have the access of drinking water at their doorstep and the drudgery of the women has also reduced.

  • Impact Assessment (M&E) Phase Project completed on 31 May, 2008 Implementation Phase
  • Implementation Phase Project started on 1 Nov, 2007 Preparation Phase

Providing drinking water to Morewadi, the hamlet of the main village Kerul. We have implemented a water system allowing the village access to a safe water supply and help build capacity of villagers to sustain their own watershed development.

Narrative

Since the village is situated at a higher elevation there was no permanent source of water in the village. Therefore the old community well which is located at 600 mtrs dist of the village was identified as a village source. Repairs were done to the well. A 5HP electric pump has been installed to lift the water and to store in newly constructed storage tank of 20,000 ltrs capacity and another storage tank of 2000 ltrs capacity. A pipeline of 860 mtr has been connected to drinking water tank and a pipeline of 460 mtrs has been laid down for the distribution of water. The individual tap connections have been provided to all the households.

Earlier the drinking water was provided through the tankers during the summer and now due to the implementation of the project, all the household have the access of drinking water at their doorstep and the drudgery of the women has also reduced.

Sustainability

Creating and measuring long-term impact

The Pani Samiti has been formed and is responsible for the connection of the water tax and responsible for the repairs and maintenance of the project.

A revenue generation model has been prepared and the provision of reserve fund has been made for any major repairs and maintenance whenever required.

Impact

People Impacted: 715

People Getting Safe Drinking Water: 715

Maintenance/Operating Costs Annual, in US$: $795

Creating and measuring long-term impact

The Pani Samiti has been formed and is responsible for the connection of the water tax and responsible for the repairs and maintenance of the project.

A revenue generation model has been prepared and the provision of reserve fund has been made for any major repairs and maintenance whenever required.

Funding

funded:
$8,913
Final Cost:
$10,696

Plan/Proposal