In 9 villages, ITC is supporting local village or cluster level communities in natural resource management to aid in eliminating land degradation and migration, and improving land productivity.

Narrative

Located in rain shadow belt adjoined with the Industrial area of Shirur (Rajangaon) near where ITC is establishing a cigarette factory.

  • Impact Assessment (M&E) Phase Project completed on 30 Jun, 2012 Implementation Phase
  • Implementation Phase Project started on 3 Feb, 2010 Preparation Phase

In 9 villages, ITC is supporting local village or cluster level communities in natural resource management to aid in eliminating land degradation and migration, and improving land productivity.

Narrative

Located in rain shadow belt adjoined with the Industrial area of Shirur (Rajangaon) near where ITC is establishing a cigarette factory.

Impact

People Impacted: 7567

People Getting Safe Drinking Water: 7567

Watershed project rejuvenated the water table for 1444 households.

People Getting Other Benefits: 7567

Funding

funded:
$75,441
Final Cost:
$87,002
$75,441:
ITC

Plan/Proposal