install rope pump in one school and one at the public place to provide safe drinking water to school children and community members.

Narrative

In the beginning community was dependent on panchyat water after installation of rope pump community got water from rope pump any time and women group saves their time, instead of waiting for water they have gone for work and got water they needed.

  • Impact Assessment (M&E) Phase Project completed on 15 Feb, 2010 Implementation Phase
  • Implementation Phase Project started on 15 Aug, 2009 Preparation Phase

install rope pump in one school and one at the public place to provide safe drinking water to school children and community members.

Narrative

In the beginning community was dependent on panchyat water after installation of rope pump community got water from rope pump any time and women group saves their time, instead of waiting for water they have gone for work and got water they needed.

Sustainability

Creating and measuring long-term impact

Training of water user group or Watsan committees members make sure that the rope pump is working.

Watsan committee members get contribution from community and repair the rope pump.

Other Issues

Unusual and unexpected issues faced during project execution

The HPPI other project was finished by the end of the project which made project staff difficult to visit the project area frequently and support the community by visiting them

Learnings

Knowledge of project and process for sharing

Project staff should stay by the community at least for two years to make a sustainable project.

Impact

People Impacted: 250

People Getting Safe Drinking Water: 250

25 families , 25 women, and 175 children from school.

School Children Getting Water: 150

150 children and 5 staff

People Getting Other Benefits: 7

2 water user group and other community members, school teachers got training from the program

Maintenance/Operating Costs Annual, in US$: $4

Creating and measuring long-term impact

Training of water user group or Watsan committees members make sure that the rope pump is working.

Watsan committee members get contribution from community and repair the rope pump.

Funding

funded:
$400
Final Cost:
$400