Model ECOSAN toilets were constructed for 3 nos. of Households in this village. The women from these households are members of women SHGs guided and monitored by Ekoventure. The women were arranged with loans from the SHGs towards their contribution.
-
S. Pushpalatha of EkoventureImplementation Status: completed Tue 04 Jan 2011, Almost 14 Years ago
ECOSAN toilets in use
All the 3 nos. of ECOSAN toliets were visited to monitor. All the families have got convinced in using this type - dry pit toilet. The toilets are kept clean and no bad odour was noticed in any of the toilets.
- Impact Assessment (M&E) Phase Project completed on 30 Jun, 2010 Implementation Phase
- Implementation Phase Project started on 1 Sep, 2009 Preparation Phase
Model ECOSAN toilets were constructed for 3 nos. of Households in this village. The women from these households are members of women SHGs guided and monitored by Ekoventure. The women were arranged with loans from the SHGs towards their contribution.
Impact
People Impacted: 15
People Getting Sanitation: 15
People Getting Other Benefits: 3
The masons were trained in the construction of ECOSAN toilets.