Self-supporting community- based mitigation program that provides arsenic safe water using modified dugwells along with public education on water related health effects.

Pw209

Narrative

The new site for borewell #PW209 is in Hyderpur village of Baduria block of N 24 Parganas district. This land is donated by Nur Mohammad to the community to construct the bore-dugwell.
_______________________________________

31st December: Boring is complete. Tried to do digging at this site but due to the water table being still high digging is postponed that will be done in the second week of January 2012.
_______________________
"After cancellation of sites and with the onset of the monsoon work was postponed. Expected to be completed by end of December.
____________________
CANCELLED SITE AFTER PILOT TEST. "

____________________
CANCELLED SITE AFTER PILOT TEST.

This site #PW203, is in the premises of the Kali Mandir of Bajetpur village of Baduria block of N 24 Parganas district.

This year there is a delay in the construction due to the following reasons:
1. during april and may no village meetings could be held because of assembly election in the state election;
2. many sites were selected and village meetings were held several months before the construction. Many sites were cancelled because of pipelines that the local panchayet came to know about later. In fact sites in two blocks, Haringhata and Bashirhat have been replaced by sites in Baduria and Swarupnagar.
3. During pilot tests due to non availability of water bearing sand layer and family or neigborly disputes by now 22 sites been cancelled.
4. At every new site village meetings are being held that leads to delay too.

    • SMS
    Farida Bibi ( Project Well ) Almost 2 Years after completion 17 Dec, 2013

    Operating Status:

    give the hand over packege

    • SMS
    Farida Bibi ( Project Well ) Over 1 Year after completion 7 Sep, 2013

    Operating Status:

    set check valve to day

    • SMS
    Suparna Mondol ( Project Well ) Over 1 Year after completion 5 Jul, 2013

    Operating Status:

    Pw-203. projector programme has been finished.M-3, F-16, Ch-20. Jangalepur/ Baduria.

    • SMS
    Farida Bibi ( Project Well ) Over 1 Year after completion 4 Jul, 2013

    Operating Status:

    i have gone to tell about projector program

    • SMS
    Farida Bibi ( Project Well ) Over 1 Year after completion 27 Jun, 2013

    Operating Status:

    good water 500g theoline was given 9families 52people drinking and cooking

    • SMS
    Suparna Mondol ( Project Well ) About 1 Year after completion 15 Jan, 2013

    Operating Status:

    Health meeting is ok. M-2, F-11, Ch-5.

    • SMS
    Farida Bibi ( Project Well ) 11 Months after completion 24 Nov, 2012

    Operating Status:

    there is drainage complet

    • SMS
    Safikul Molla ( Project Well ) 10 Months after completion 16 Oct, 2012

    Operating Status:

    NUR MAHAMMAD IS THE OWNER. 21 USERS. OTHERS DO NOT USE BECAUSE WELL IS PROVIDED BY PEOPLE FROM DIFFERENT RELIGION.

    Meera Hira-Smith ( Project Well ) 3 Months after completion 20 Mar, 2012

    construction is complete

    Status: Complete - Success, Late

    Operating Status:

    construction is complete

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2011 Implementation Phase
  • Implementation Phase Project started on 30 Nov, 2010 Preparation Phase

Self-supporting community- based mitigation program that provides arsenic safe water using modified dugwells along with public education on water related health effects.

Narrative

The new site for borewell #PW209 is in Hyderpur village of Baduria block of N 24 Parganas district. This land is donated by Nur Mohammad to the community to construct the bore-dugwell.
_______________________________________

31st December: Boring is complete. Tried to do digging at this site but due to the water table being still high digging is postponed that will be done in the second week of January 2012.
_______________________
"After cancellation of sites and with the onset of the monsoon work was postponed. Expected to be completed by end of December.
____________________
CANCELLED SITE AFTER PILOT TEST. "

____________________
CANCELLED SITE AFTER PILOT TEST.

This site #PW203, is in the premises of the Kali Mandir of Bajetpur village of Baduria block of N 24 Parganas district.

This year there is a delay in the construction due to the following reasons:
1. during april and may no village meetings could be held because of assembly election in the state election;
2. many sites were selected and village meetings were held several months before the construction. Many sites were cancelled because of pipelines that the local panchayet came to know about later. In fact sites in two blocks, Haringhata and Bashirhat have been replaced by sites in Baduria and Swarupnagar.
3. During pilot tests due to non availability of water bearing sand layer and family or neigborly disputes by now 22 sites been cancelled.
4. At every new site village meetings are being held that leads to delay too.

Learnings

Knowledge of project and process for sharing

Construction of bore-dugwell, boring and digging, should complete before the monsoon or rainy season. We have learnt that even after boring is completed, digging cannot be done when the water table is high without using heavy duty water pump. However, low ordinary pump is used when the water to be pumped out is maximum 4 feet in the dugwell.

Impact

People Getting Safe Drinking Water: 40

Registers will be created as soon as the community starts using the water from this bore-dugwell.

Maintenance/Operating Costs Annual, in US$: $40

Creating and measuring long-term impact

Implementer: Project Well & Aqua Welfare Society

Aqua Welfare Society (AWS) is the partner NGO of Project Well. Their office is based in North 24 Parganas. The seven honorary board members are located in Kolkata. New field workers have been engaged mainly for the surveillance program. There is one project manager, one technical manager, one awareness program manager, two technical assistants, one maintenance assistant, one assistant for data entry, one account assistant and three field workers; three more field workers will be hired. All field staff are constantly interacting with the villagers and beneficiaries, training the users on well maintenance, organizing village meetings and health meetings. The project manager visits the villages three to four times a week and works alongside the field workers, meeting with government officials and villagers, selecting sites, coordinating well construction, sending reports to Project Well and meeting with the members AWS to keep the projects running. The awareness programmer is in charge of conducting public education programs in the communities and educational institutions, which is the other component that makes our program sustainable.

Funding

Funded:
$1,160

Plan/Proposal