The project will consist of the repairs to two existing spring boxes for future use and the replacement of inadequate tubing in one sector of the village. The village will provide all of the materials and we will provide two weeks labor remaining from the

Narrative

The repairs to the spring boxes will allow the village to connect these extra spring in the future when needed. The laying of new larger pipe in sector #3 of the village will allow for better flow to homes.

  • Impact Assessment (M&E) Phase Project completed on 30 Jan, 2009 Implementation Phase
  • Implementation Phase Project started on 15 Jan, 2009 Preparation Phase

The project will consist of the repairs to two existing spring boxes for future use and the replacement of inadequate tubing in one sector of the village. The village will provide all of the materials and we will provide two weeks labor remaining from the

Narrative

The repairs to the spring boxes will allow the village to connect these extra spring in the future when needed. The laying of new larger pipe in sector #3 of the village will allow for better flow to homes.

Sustainability

Creating and measuring long-term impact

The village has an established maintenance program and trained men to work on the system

Other Issues

Unusual and unexpected issues faced during project execution

The original project #108 was to increase the amount of flow to the distribution tanks. This extra projects is to make improvements as funds allow to create better distribution of water to one sector of the village experiencing flow problems.

Impact

People Getting Safe Drinking Water: 350

260 Families are connected to the water system to be augmented and 90 families are not. We made a design during the work to modify the entire system provided funds are available.

Funding

funded:
$2,123
Final Cost:
$2,123