This project will provide access to safe, reliable water to 40 families in the village of Nueva America. Project includes water system, formation of training of local water committee and community water & hygiene workshops.

Narrative

This water project utilized a Hydro pneumatic Tower. The Hydro pneumatic Tower was connected to a water distribution system that distributes the water to each of the 42 households. Each family was responsible for assisting in the manual labor necessary to install the water system and financially contribute to the cost of materials necessary for their own domestic connection. Each family has a meter to calculate water usage so that appropriate rates can be applied to ensure sustainability of the system. People of Montegrande elected five villagers to serve on a local Water Committee. Family members use the water system, conserve water, pay their tariffs regularly, and practice healthy hygiene practices. The education program focuses hygienic habits involving hand-washing, food, cooking utensils, water, and latrines. The Department of Basic Sanitation of the Municipality of San Pedro and Etta Projects worked together to offer training to the members of the Water Community and the village at large.

  • Katie Chandler of Etta Projects
    • confidential
    • Mobile
    Implementation Status: completed Thu 30 Jan 2014, About 10 Years ago

    [No Title]

    [Empty]

  • Katie Chandler of Etta Projects
    • confidential
    • Mobile
    Implementation Status: completed Mon 27 Jan 2014, About 10 Years ago

    dilma reading the water meter

    The treasurer has all her notes prepared. Etta projects is copying them on paper because the system does not work.

    • 13908461...
    • 13908461...
    • 13908461...
  • Katie Chandler of Etta Projects
    • confidential
    • Mobile
    Implementation Status: completed Mon 27 Jan 2014, About 10 Years ago

    [No Title]

    [Empty]

    • 13908466...
    • 13908465...
  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2013 Implementation Phase
  • Katie Chandler of Etta Projects
    • confidential
    Implementation Status: completed Mon 11 Nov 2013, Over 10 Years ago

    How the project impacted one family in Nueva America

    Fermín Aguirre Ortiz is one of the many happy members of Nueva América, who recently benefited from the new water system. He is 63 years old and has been a part of this community for the past 22 years. This past year his wife Juana Flores passed away from complications due to arthritis. He now lives with their 12 year old granddaughter that he and his wife have raised. Fermin is a dedicated to his work with agriculture.
    Fermin said, “ I have great joy and feel very happy and peaceful now because I have clean, safe water and can now bathe with ease. I don’t have to use the tube now, which had dirty and contaminated water”.
    Fermin participated in all of the sanitation workshops and actively worked to help with the installation of the water system.

    • Story__F...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 04 Nov 2013, Over 10 Years ago

    Coordinación para la reunión de rendición de cuenta del Proyecto de Agua

    Se hablo por teléfono al CAPyS Comite Agua Potable y Saneamiento ( Paola y Bruno), para coordinar la reunión de rendición de cuenta del presupuesto del Proyecto de Agua. Reunión que se realizará el día jueves 07 de noviembre despues del medio día.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 04 Nov 2013, Over 10 Years ago

    INFORME MENSUAL OCTUBRE 2013

    se elaboró el informe mensual del proyecto de agua Nueva América, adjunto el mismo

    • Informe_...
    • Historia...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 31 Oct 2013, Over 10 Years ago

    Reunión de rendición de cuenta proyecto de agua Nueva América.

    Se tenía previsto realizar la reunión para rendir cuentas del presupuesto del proyecto de agua Nueva América, sin embargo el Presidente del CAPyS Sr. Bruno Mamalli no habia convocado a la comunidad y él por motivos familiares no se encontraba en la comunidad al igual que la mayoría de los comunarios quienes estaban en sus chacos. El equipo vio pertinente retornar a Montero, se verá otra fecha para realizar la reunión, se coordinara con otros miembros de CAPyS.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 24 Oct 2013, Over 10 Years ago

    Nueva Amèrica goza de agua segura !!!

    El día domingo 20 de octubre del 2013 en la comunidad de Nueva Amèrica se concluyó con el trabajo de instalación del sistema de agua, desde ese día la comunidad está muy agradecida con la instutición por haber apoyado a la comunidad para que el proyecto de Agua sea una realidad.

    A continuación adjunto fotografias que reflejan la felicidad de la comunidad...

    • NUEVA_AM...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 14 Oct 2013, Over 10 Years ago

    Comunidad a la espera del equipo técnico que realizará la instalación del sistema de agua.

    La comunidad Nueva América ya realizó las excavaciones y todas las tareas como: construcción de la caseta para el tablero de la bomba, recepción de materiales y está organizada para el trabajo que realizará con Plastiforte en la instalación del sistema de agua.

    Actualmente la comunidad esta aguardando la llegada del equipo técnico de Plastiforte para iniciar el trabajo.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 14 Oct 2013, Over 10 Years ago

    Recepción de materiales para la instalación del Sistema de Agua

    El día de ayer llegó el camión con todos los materiales que Plastiforte envío para la instalación del sistema de agua en Nueva América.

    La Ing. Dilma estuvo en la recepción del mismo actividad que contó con el apoyo de toda la comunidad.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Sat 05 Oct 2013, Over 10 Years ago

    LIMPIEZA DEL POZO Y COLOCACIÓN DE LA BOMBA SUMERGIBLE

    El día de hoy por la tarde la empresa LA GOTA realizó la limpieza del pozo y colocó la bomba sumergible.

    • Instalac...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 01 Oct 2013, Over 10 Years ago

    Realizar seguimiento a la caseta para la instalación del tablero de la bomba hidromagnética

    Se llamo a los miembros del CAPyS lamentablemente no se pudo hablar con ninguno, se llamo al Sr. Nicolas Mamalli dirigente de la comunidad a quién se le preguntó si ya habian realizado la caseta para el tablero, tarea que le dejo en su visita el día sabado el Sr. Luis Melgar propietario de la empresa LA GOTA, empresa que va estar a cargo de realizar la instalación de la bomba sumergible, ensayo de la bomba sumergible, aforo y limpieza del pozo.
    El Sr. Nocolas mamamlli dijo que aún no habian realizado este trabajo, se quedo que en el transcurso de hoy tienen que realizarlo ya que mañana el Sr. Luis Melgar entrará a trabajr en la comunidad.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 01 Oct 2013, Over 10 Years ago

    Informe mensual de septiembre

    Se concluyó con la elaboración del informe mensual correspondiente al mes de septiembre. Se adjunta el mismo.

    • Informe_...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 01 Oct 2013, Over 10 Years ago

    Realizar seguimiento a la caseta para la instalación del tablero de la bomba hidromagnética

    Se llamo a los miembros del CAPyS lamentablemente no se pudo hablar con ninguno los celulares se encontraban fuera de area, se llamo al Sr. Nicolas Mamalli dirigente de la comunidad a quién se le preguntó si ya habian realizado la caseta para el tablero, tarea que le dejo en su visita el día sabado el Sr. Luis Melgar propietario de la empresa LA GOTA, empresa que va estar a cargo de realizar la instalación de la bomba sumergible, ensayo de la bomba sumergible, aforo y limpieza del pozo.
    El Sr. Nicolas Mamamlli dijo que aún no habian realizado este trabajo, se quedo que en el transcurso de hoy tienen que realizarlo ya que mañana el Sr. Luis Melgar entrará a trabajar en la comunidad.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 25 Sep 2013, Over 10 Years ago

    Visita a la comunidad para supervisar trabajo

    El Gerente de Proyectos Etta Projects Bolivia Matt Clements visitó la comunidad de Nueva América para realizar el seguimiento al trabajo de excavación de la Red Matriz.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Fri 20 Sep 2013, Over 10 Years ago

    Trabajo de excavación de la red matriz con gran avance

    El Sr. Bruno Mamalli Presidente del CAPyS llamo para avisar que ya habian avanzado gran parte de la excavación de la red matriz que sólo le faltaba cavar alrededor de 60 mt.

    Se felicitó a la comunidad y se le dijo que el día 25 de septimebre cómo habiamos quedado en la última reunión se visitará para realizar la supervisión correspondiente del trabajo ( Excavación red matriz)

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 16 Sep 2013, Over 10 Years ago

    Medición y estaqueo de la red matriz

    Se visitó la comunidad de Nueva América con los objetivos de:
    1.- Realizar la medición y estaqueado de la red matriz.
    2.- Reunión de organización a la comunidad para realizar el trabajo de excavación de la red matríz.

    Para la medición y estaqueado de la red matriz se contó con el apoyo de un personal ( Topografo) del Gobierno Municipal de Santa Rosa.
    Se coordinó con la comunidad que el día 25 de septiembre se llamará y se visitará la comunidad para realizar seguimiento al trabajo de excavación.

    • Estaquea...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 09 Sep 2013, Over 10 Years ago

    Llamada Presidente CAPyS

    Llamo el Sr. Bruno Mamalli para preguntar la hora de visita de la Ing. Dilma, se le dijo que no sabía si hoy visitará la comunidad.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Sat 07 Sep 2013, Over 10 Years ago

    Visita a la comunidad para realizar el trabajo de medición red matriz.

    Llame al Sr. Bruno Mamalli Presidente del CAPyS para avisarle que la Ing. Dilma Rodriguez entrará a la comunidad para realizar el trabajo de medición que la esperen, comuniqué que mi persona no irá y que avise a los profes que los talleres con los niños se realizará cuando se instale el sistema de agua.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 04 Sep 2013, Over 10 Years ago

    Comunicar actividades a realizar el día 09 de septiembre

    Llamé por teléfono a la Sra. Paola Aguirre Vocal de la CApyS para comunicarle que entratré a la comunidad el día lunes 09 de septiembre y no el 11 como habiamos planifcado esto por el tema de vehículos ya que actualmente en la oficna sólo contamos con una movilidad y los días lunes el personal que trabaja con huertos y escuelas saludables no trabajan los días lunes.

    Lamentablemente no encontré a la Sra. Paola su esposo estaba manejando el celular y se encontraba en la ciudad de Santa Cruz pero estaba retornando deje el encago que avisará a la Sra. Paola el cambio de fecha de la actividad para que informe a la comunidad.
    Aprovechando que hable con el esposo de la Sra. Paola hijo del Sr. Clemente Rivera Plometro del CAPyS le indique que avisé a su padre que estaré el día lunes en la comunidad y que puede darme su contraparte para la compra de su medidor ya que es una de las personas que no dió su contraparte por la falta de recursos económicos.

  • Katie Chandler of Etta Projects
    • confidential
    Implementation Status: in_progress Wed 04 Sep 2013, Over 10 Years ago

    August Training Report Update

    Summary in English:
    There were many activities accomplished this past month. Most notably the project facilitated five workshops:
    1. Community Workshop: Sanitation Improvements
    2. Community Workshop: Importance of Proper Water Storage
    3. Student Workshop: hand washing
    4. Student Workshop: Prevention of Common Community Deseases
    5. Student Workshop: Food hygiene

    The project also made home visits to strengthen health education content for those unable to attend meetings and workshops. Home visits were done on two separate occasions and emphasized the importance of attending workshops to gain knowledge about issues that are of importance to the community and offered a brief recap of the project themes. It was also an opportunity to monitor project results through direct observations.

    One challenge has been the difficulty to observe and learn about practices of personal hygiene, especially hand washing, in the community due to their lack of water. However home visits have helped us to gain knowledge and participation from the community members.

    For the month of September there are more workshops planned with students on healthy living at home and garbage management. There will also be home visits in the community to strengthen knowledge of issues and to implement monitoring tools to measure the effects if workshops and visits. There will also be implementation and monitoring of hand washing corners.

    This upcoming month the community will organize for excavation work for the matrix network system of installment. Unfortunately, the implementation of the system is delayed according to the original project timeline. It is now been confirmed for September 16.

    • nueva_am...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 02 Sep 2013, Over 10 Years ago

    Confirmar Lista de socios para la instalación del Sistema de Agua Nueva América

    Llame a al Sr. Bruno Mamamlli para que me pueda comunicar con la Sra. Sabina Aguirre Teosrera del CAPyS con el objetivo de confirmar los nombres de los socios del Proyecto Agua lamentablemente no lo encontré contesto su esposa. Don Bruno estaba en su chaco y la Sra. Sabina en Yapacani

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 02 Sep 2013, Over 10 Years ago

    INFORME MENSUAL AGOSTO

    Los días 01 y 02 de septiembre se elaboró el informe mensual de actividades del mes de agosto del Proyecto de Agua Nueva América.

    • Informe_...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 28 Aug 2013, Over 10 Years ago

    VERIFICAR TRABAJO COMUNITARIO

    El día 28 de agosto , se verificó el trabajo realizado por la Cooperativa Rural de Electrificación (CRE) en lo que respecta a la ampliación del tendido eléctrico.

    De igual forma la comunidad elaboró la pilastra para la instalación del medidor monofásico perteneciente a la bomba hidromagnética que será la fuente generadora de agua en la comunidad Nueva América.

    • ELABORAC...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 26 Aug 2013, Over 10 Years ago

    Reunión con Presidente CAPyS

    Visita del Presidente del CAPyS Sr. Bruno Mamalli para presentar personalmente a la CRE la solicitud del Medidor Monofásico.

    Ayer por la mañana me reuní con el Sr. Mamalli quién me comento que el sábado 17 de agosto el CAPyS hizo una reunión con la comunidad para hablar sobre la cancelación de la contraparte del proyecto de agua. La misma que tiene un plazo de cancelación hasta el día jueves 29 de agosto.
    Se coordinó la realización de la reunión para el día 29 de agosto por la tarde esto con el objetivo de presentar el plano para organizar a la comunidad en el trabajo de excavaciones la reunión será con el equipo de personal de Etta Projects ( Dilma, Matt y María Edilda).
    Tambien se confirmó las actividades que realizará la Coordinadora de Saneamiento con los estudiantes como los talleres de: Higiene de los alimentos y la vivienda. Y las visitas domiciliarias para fortalecer conocimientos sobre los temas de importancia y cuidados del agua com también las enfermedades más frecuentes de la comunidad.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Fri 23 Aug 2013, Over 10 Years ago

    Realizar seguimiento a la instalación de postes para el tendido eléctrico

    Hable con el Sr. Nicolas Mamalli Presidente del Sindicato de Nueva Amèrica para verificar si la CRE realizó el trabajo de instalación de los postes, me comunicó que el día de ayer jueves 22 de agosto la CRE realizó realizó este trabajo.
    Comuniqué al Sr. Nicolas que avise al Sr. Bruno Mamalli Presidente del CAPyS que se traslade hoy día a la ciudad de Montero para que realice de manera personal la solictud del medidor monofásico.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 19 Aug 2013, Over 10 Years ago

    Resultados de la reunión CAPyS y comunidad

    Llame a la Sra. Paola Vocal CAPyS para saber los resultados de la reunión realizada el día sábado 17 de agosto con la comunidad lamentablemente no la encontré me respondio su esposo ella habia salido a su chaco.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 19 Aug 2013, Over 10 Years ago

    Resultados de la reunión CAPyS y comunidad

    Llame a la Sra. Paola Vocal CAPyS para saber los resultados de la reunión realizada el día sábado 17 de agosto con la comunidad lamentablemente no la encontré me respondio su esposo ella habia salido a su chaco.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Sun 18 Aug 2013, Over 10 Years ago

    Realizar seguimiento a la reunión del CAPyS con la comunidad.

    Llame a la Sra. Paola Vocal del CAPyS para ver si realizaron la reunión con la comunidad el día sabado 17 de agosto como habiamos acordado en mi visita realizada los días 13 y 14 de agosto, no pude hablar con ella porque habia salido hable con su esposo quien me dijo que si realizaron la reunión.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Sun 11 Aug 2013, Over 10 Years ago

    Confirmar visita y talleres con estudiantes

    Hable con la Sra. Paola a quién le confirme mi visita los días 13 y 14 de agosto para realizar talleres con los niños y niñas de la escuela, taller con la comunidad en el tratamiento sanitario de la basura y realizar visitas domiciliarias para firtalecer el tema de tratamiento de la basura, alvado de manos y dejar tareas para la próxima visita.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 07 Aug 2013, Over 10 Years ago

    LLAMADA AL CAPyS PARA INFORMAR Y CONFIRMAR TALLER.

    Ayer por la tarde vía teléfono hable con la Sra. Paola Aguirre Vocal del CAPyS a quién comuniqué que no tendriamos taller este 08 de agosto, sino el 12 y 13 de agosto. Que comunique a la comunidad y al resto del CAPyS.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 07 Aug 2013, Over 10 Years ago

    SEGUIMIENTO - PROY. AMPLIACION TENDIDO ELECTRICO

    El dia de hoy, nos comunicamos con el Ing. Erwin Rodriguez Jefe de Proyectos de la CRE, quien nos informo, que esta planificado realizar la ampliacion del tendido electrico en Nueva America el dia Viernes 9 del mes en curso.

    De acuerdo al siguiente plan :

    1. instalacion de 2 postes por un costado de la escuela, ubicados desde la calle de la Cede hasta el pozo, atravesando la escuela y cancha.

    2. Instalacion de la linea de Baja Tension.

    Tambien se nos informo que la proxima semana se realizara la instalacion del medidor monofasico. (Actualizado por DRR)

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 05 Aug 2013, Over 10 Years ago

    LLAMADA AL CAPyS PARA CONFIRMAR FECHA DEL TALLER

    Hoy día intenté comunicarme con los integrantes del CApyS lamentablemente nadie tenía su celular prendido.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Sat 03 Aug 2013, Over 10 Years ago

    CRONOGRAMA MENSUAL

    Se elaboró el cronograma de actividades para el mes de agosto. Adjunto el mismo.

    • Cronogra...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Sat 03 Aug 2013, Over 10 Years ago

    INFORME DEL MES DEJULIO

    Se concluyó y se presento el informe al Lic. Matt Clements Gerente de Etta Projects - Bolivia. Se adjunta el informe.

    • Informe_...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Fri 02 Aug 2013, Over 10 Years ago

    ELABORACIÓN DE INFORME

    Estoy elaborando el informe de actividades desarrolladas en el mes de julio.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 01 Aug 2013, Over 10 Years ago

    LLAMADA AL CAPyS PARA COORDINAR

    Hoy realicé una llamada teléfonica al Sr. Bruno Mamalli lamentablemente su celular esta fuera de área, entonces llame a la Sra. Paola Aguirre Vocal del CAPyS para decirle que mañana la llamaré para confirmar las actividades a realizarse los días 08 y 09 de agosto como: talleres a niños, a la comunidad, visitas domiciliarias.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 01 Aug 2013, Over 10 Years ago

    LISTA DE PARTICIPANTES EN LOS TALLERES

    Se elaboró el consolidado de la lista de participantes en los talleres con la comunidad, niños y CAPyS, por sexo, talleres desarrollados y fechas. se adjunta documento

    • Copia_de...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Wed 31 Jul 2013, Over 10 Years ago

    Actualizaciones y adjuntos a las notas de Progreso

    Los días 29 y hoy 31 de julio se agragaron, notas de progreso , fotografias y documentos a la página de Peer Water., todos estos documentos corresponden a los meses de: abril mayo y junio. Se seguirá argumentando las notas de progreso del mes de julio así tambien se adjuntaran fotografias.

  • Katie Chandler of Etta Projects
    • confidential
    Implementation Status: in_progress Wed 31 Jul 2013, Over 10 Years ago

    Informe Mensual Mes de Julio

    The attached report includes project activities and photos.

    • Informe_...
  • Dilma Rodriguez
    • Visitor
    • confidential
    Implementation Status: completed Fri 19 Jul 2013, Over 10 Years ago

    INSPECCION DE CRE - AMPLIACION DE TENDIDO ELECTRICO

    En fecha 19 de Julio, se realizo una inspeccion a la comunidad en compania del Sr. Arauz y el Ing. Moreno funcionarios de CRE, mi persona y el Sr. Bruno Mamalli, Presidente del CAPyS, nos apersonamos a la comunidad, verificamos la ubicacion del pozo perforado, la acometida de energia electrica mas cercana al pozo, se procedio al estacado de la ubicacion donde se colocaran los postes, seran instalados 2 postes con una distancia de 40 mts, estos postes pasaran por la escuela, permitiendo el alumbrado publico de la escuela y la cancha.

    El dia lunes, estos funcionarios presentaran el informe, para que el dia martes sea recibido por el Ing. Erwin Rodriguez, proyectista de la CRE para que elabore el proyecto de ampliacion de tendido electrico,.

    Se ha solicitado el apoyo de la CRE, para que esta ampliacion sea gratuita, ya que la CRE solo cubre hasta 25 mts, sin costo. Asi como tambien se ha decidido que el medidor sea monofasico.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 18 Jul 2013, Over 10 Years ago

    Taller higiene de los alimentos y la vivienda

    Se desarrolló el quinto taller con la comunidad, el tema fue higiene de los alimentos y la vivienda. Los y las participantes aprendieron sobre los grupos de alimentos: ( cereales, verduras, frutas, productos lácteos, carnes y frijoles). También conocieron cuáles son los alimentos formadores energéticos y los alimentos reguladores.
    Posteriormente los y las participantes aprendieron realizando una práctica en campo sobre la higiene de los alimentos, para ello se organizaron 3 grupos de trabajo , los cuales prepararon unas ensaladas de verduras al finalizar la actividad cada grupo dio a conocer los procedimientos seguidos, la facilitadora hizo notar la importancia de aplicar el lavado de manos correctamente ya que en dos grupos lo hicieron en el momento de pelar las verduras y no antes, así también utilizando el rota folio se mostró el dibujo con los pasos que se deben seguir antes y durante la preparación de los alimentos sobre esto se hizo un análisis y reflexión.
    Para concluir con la jornada de capacitación también los y las participantes aprendieron sobre la importancia de tener una vivienda limpia la cual será muy saludable para todos sus habitantes.
    Se continúo con la estrategia de realizar una rifa a las personas más puntuales en esta ocasión se rifo una gaseosa y un paquete de galletas.En esta actividad participaron 14 personas se volvio a recalcar al CAPyS hacer extensiva la asistencia de las personas que tienen lotes y que no viven en la comunidad ya que también ellos se beneficiaran con el agua.

    • DSCN8044...
    • DSCN8049...
    • DSCN8057...
    • DSCN8058...
    • DSCN8061...
    • DSCN8063...
    • DSCN8064...
    • DSCN8065...
    • DSCN8067...
    • DSCN8068...
    • DSCN8073...
    • DSCN8079...
    • DSCN8078...
    • DSCN8083...
    • DSCN8097...
    • DSCN8099...
    • DSCN8098...
    • DSCN8096...
    • DSCN8072...
    • DSCN8074...
    • DSCN8088...
    • DSCN8087...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 17 Jul 2013, Over 10 Years ago

    Taller enfermedades más frecuentes en nuestra comunidad

    DUPLICADO

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 17 Jul 2013, Over 10 Years ago

    Taller enfermedades más frecuentes en nuestra comunidad

    Se realizó el cuarto taller con la comunidad en el tema de enfermedades más frecuentes en nuestra comunidad (Los Piojos, Hongos y Sarna,) los y las participantes aprendieron cuáles son las causas por las cuáles nos infectamos o contagiamos de estas enfermedades, los tratamientos recomendados y los cuidados que debemos tener en casa para no infectarnos o contagiarnos.
    Se utilizó como estrategia para iniciar el taller en la hora acordada una rifa de una polera, esto se coordinó con la comunidad en el anterior taller que se brindo ya que en su mayoría tienen la costumbre de llegar atrasados. La estrategia funcionó y la misma seguiremos aplicando en los próximos talleres.
    Cabe aclarar que la rifa se realizó con las personas que llegaron en el tiempo que se estableció como límite de espera para iniciar el taller por ejemplo se convocó para las 17:00 el taller inició a las 17:15 con todos los presentes los cuales entraban al sorteo de la rifa al final del taller.
    Los participantes en este taller fueron 12 una de las dificultades que se tuvo fue la poca asistencia debido a que algunos comunarios despues de estar en Santa Rosa se trasladaron a Ayacucho comunidad aledaña a Nueva América la cual estaba de aniversario.
    La comunidad sabia que tenía que estar en la actividad ya que la misma fue anunciada el 02 de julio cuando tuvimos el 3er taller.
    P ara nivelar en conocimientos a los participantes que faltaron se haran visitas domicililiarias en fecha 09 de agosto para brindar charla sobre el tema desarrollado. Se adjunta fotografias de la actividad.

    • DSCN8042...
    • DSCN8043...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 17 Jul 2013, Over 10 Years ago

    Taller enfermedades más frecuentes en nuestra comunidad

    DUPLICADO

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 17 Jul 2013, Over 10 Years ago

    Taller enfermedades más frecuentes en nuestra comunidad

    DUPLICADO

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 17 Jul 2013, Over 10 Years ago

    CONFIRMAR ACTIVIDADES DE CAPACITACIÓN

    Se logró hablar vía teléfono con el Sr. Nicolás Mamalli para confirmar las actividades de capacitación en la comunidad.

    El Sr. Nicolás manifestó que la mayoría de los comunarios en el transcurso del día estarian en Santa Rosa ya que el Presidente de la República Sr. Evo Morales estaría en el municipio y todos fueron convocados para recibirlo ya que si no lo hacian deberian pagar una multa de Bs. 150. El taller se realizará al finalizar la tarde, ya los comunarios estaran en la comunidad.
    El Sr. Bruno Mamalli presidente del CAPyS se quedo en la comunidad para esperar a la comisión de la CRE que trabajará haciendo la la inspección del tendido electrico.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 15 Jul 2013, Over 10 Years ago

    PLANIFICAIONES TÉCNICAS PARA LOS TALLERES EN LA COMUNIDAD

    Elaboré la planificación técnica para los talleres con la comunidad en Nueva américa.
    Temas: Enfermedades más frecuentes en la comunidad, higiene de la vivienda y de los alimentos. Se adjuntan las planificaiones.

    • PLANIFIC...
    • PLANIFIC...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 10 Jul 2013, Over 10 Years ago

    REUNION Y PRESENTACION DE DOCUMENTACION CRE

    El dia de hoy, conjuntamente con el Sr,. Nicolas Mamalli autoridad de la comunidad de Nueva America, nos apersonamos a la CRE, para presentar planos de ubicacion, facture de luz del medidor mas cercano al punto de instalacion solicitado, y una carta de respaldo de nuestra institucion para la solicitud de la amplacion de red de Baja tension.

    Nuevamente nos comunicamos con el Ing. Jordan para explicar que se presento todos los requisites como el nos senalo.

    El Ing. Jordan nos indico que iba a priorizar la visita de una commission ala comunidad para verificar la distancia de ampliacion y pertinencia del mismo, asi como tambien para adelantar en la misma visita se iba a colocar la demarcacion de ubicacion de postes.

    El Sr. Nicolas Mamalli, se comprometio que llegando a su comunidad iban a designer a un par de personas por dia, para que esten en la comunidad prestos a recibir a la commission de CRE, para explicar la ubicacion del pozo y otros aspectos a tomar en cuenta.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Tue 09 Jul 2013, Over 10 Years ago

    AMPLIACION TENDIDO ELECTRICO BAJA TENSION

    El dia de hoy se realize una visita a la Cooperativa Rural de Electrificacion, con objetivo de verificar los avances en cuanto a la solicitud de instalacion de un medidor trifasico, en esta reunion en compania del Sr. Nicolas Mamalli, la cooperative nos inform que desafortunadamente la solicitud de iinstalacion de un medidor trifasico ha sido rechazada, segun un informe tecnico que presento el departamento de electrificacion.

    Inmediatamente nos comuicamos con plastiforte, para comunicar los cambios y plastiforte indico que este no es un problema y que puede ser un medidor monofasico.

    Nuevamente nos apersonamos a la cooperativa para llenar los formularios de solucitud de medidor monofasico, el Sr. Juan Medina, fue el responsible en atendernos, nos informo que primero debemos solicitor una ampliacion de red de Baja tension, debido a que la red de Baja tension se encuentra a 80 mts. de distancia del punto de ubicacion del medidor solicitado.

    Asi mismo, se nos informo acerca de los plazos, procesos y requisites que debemos cumplir.

    Solicitamos una reunion con el Gerente de la Cooperativa Rural de Electrivicacion, Ing. Robert Vaca y con el Ing. Wilner Jordan Director de Departamento de Ampliacion de Red Rural, en la cual ellos nos hicieron conocer que el punto de partida es la visita de una commission a la comunidad , para elevar un informe de la pertinencia de la ampliacion, el analisis del costo/beneficio, una vez el informe certifique la pertinencia dle mismo, nuevamente una commission de CRE se trasladara a la comunidad para hacer la demarcacion de ubicacion de postes y finalmente el trabajo de ampliacion e instalacion de medidor.

    En esta reunion explicamos la importancia de agilizar esto lo antes possible, ya que se nos explico que esto podria demorar 2 meses, explicamos que no podemos esperar tanto tiempo por que estamos listos para la implementacion del sistema, pero que esta implementacion no se puede realizer si no se cuenta con la energia electrica para hacer las pruebas necesarias.

    El Ing. Vaca e Ing. Jordan, se comprometieron a apoyarnos y tartar de agilizar lo antes possible.

  • Katie Chandler of Etta Projects
    • confidential
    Implementation Status: completed Wed 03 Jul 2013, Over 10 Years ago

    June Progress Report

    I. Executive Summary

    Three workshops were held in Nueva America and progress has been made with the municipal government for them to fulfill their obligations to the project.

    II. Project Beneficiaries and Location

    Project beneficiaries are 40 families within the community of Nueva America, department of Santa Cruz, Bolivia. Etta Projects and the municipal government have contracted Plastiforte to construct a water system to deliver potable water to project beneficiaries.

    Etta Projects will also build capacity for the community to administer the water through the formation and training of a Local Water Committee (CAPyS). Lastly, Etta Projects will hold workshops for project beneficiaries covering the education about and training of sanitation methods.

    III. Project Activities

    Three workshops were held in the month of June: first, the first part of CAPyS training to administer the water system; second, a workshop discussing sanitation themes with the general community; and lastly, a workshop with the children on general sanitation.

    The municipal government has assured our staff that they will deliver their diagnostic assessment in the first week of July. Once that is received, it and other relevant materials will be delivered to Plastiforte to develop a time-line of installation for the water system.

    IV. Project Challenges and Lessons Learned

    June saw an unseasonably large quantity of rain. This made the road into Nueva America impassable for a period of time and led to four scheduled workshops being postponed.

    V. Steps Moving Forward

    In July, an installation schedule with Plastiforte should be completed.

    Training will continue in Nueva America with the goal of seven workshops: one, a repeat of the first CAPyS workshop to train new members joining the committee; another two with CAPyS on administration of the water system; and four with the general community on hand washing, illness, food sanitation, and potability of water.

    VI. Project Impact

    While conducting baseline assessment the following story was recounted to a staff member by Maria Ramos, 35 years of age:

    “My family used to collect our water from a water wheel located nearby. I can remember frogs and toads frequently coming over the water wheel and into my bucket or onto me. One day a poisonous snake came over and landed next to my foot. At this moment I decided I would not use the water wheel anymore.

    From then on, we have used a wheelbarrow to collect 40 liters of water a day from a neighbor who has a pump. I look forward to having clean and safe water delivered to my house.”

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 02 Jul 2013, Over 10 Years ago

    Taller lavado de manos

    El taller de lavado de manos se efectuó de manera práctica y participativa con los y las participantes de la comunidad Nueva América.
    Se siguieron los seis pasos para un adecuado lavado de manos:
    1.-Mojar las manos con agua
    2.-Enjabonar las manos
    3.-Frotarse bien las manos por lo menos 30 segundos
    4.-Sacar la suciedad de las uñas con cepillo o un palito pequeño
    5.-Enjuagar las manos con abundante agua
    6.-Secarse con una toalla o trapo limpio.
    Finalizada la actividad práctica se reflexionó que con un buen lavado de manos podemos prevenir muchas enfermedades.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 01 Jul 2013, Over 10 Years ago

    TALLER COMUNAL : FUENTES DE ABASTECIMIENTO Y CUIDADOS DEL AGUA

    Se efectuo el taller FUENTES DE ABASTECIMIENTO Y CUIDADOS DEL AGUA con participacion de toda la comunidad de Nueva America, a traves de este taller, se procedio a que los comunarios realicen un autodiagnostico de manera participativa sobre las fuentes de abastecimiento de agua de la comunidad y los cuidados, es decir los metodos de purificacion y desinfeccion del agua que ellos utilizan

    Al finalizar el taller, la comunidad reflexiono sobre la importancia de mantener el agua segura, y como o que podemos hacer para mantener el agua segura, asi como tambien reflexiono sobre el impacto negativo en la salud, al consumir agua no segura.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 01 Jul 2013, Over 10 Years ago

    Taller fuentes y cuidados del agua

    A través del levantamiento de un autodiagnóstico se realizó el taller con la comunidad Nueva América el mismo fue participativo el tema fue: las fuentes y cuidados del agua.
    Se llegó a la conclusión que actualmente la mayoría de los comunarios tiene como fuente de abastecimiento la perforación de un pozo que les provee el recurso vital como es el agua a través de un tubo. También se pudo percibir que el agua que consumen no es segura y el 99% no trata el agua por falta de información y concientización.

    Los participantes manifestaron que recién una institución como Etta Projects los está capacitando.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Fri 28 Jun 2013, Over 10 Years ago

    PLANIFICACIONES TÉCNICAS TALLERES CON LA COMUNIDAD

    Realicé la elaboración de planificaciones técnicas de los contenidos a desarrollar en los talleres: Importancia y cuidados del agua, lavado de manos.

    • PLANIFIC...
    • PLANIFIC...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Fri 28 Jun 2013, Over 10 Years ago

    ELABORACIÓN DE INFORME MES DE JUNIO

    Se elaboró el informe mensual de Junio. Se adjunta el mismo.

    • Informe_...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 25 Jun 2013, Almost 11 Years ago

    REUNION TELEFONICA SR. NICOLAS MAMALLI-AUTORIDAD NUEVA AMERICA

    Nos comunicamos con el Sr. Nicolas Mamalli, con el objetivo de solicitar informacion acerca del estado del camino debido al mal tiempo, Hace una semana se ha presentado un frente frio y fuertes lluvias, y esto ha ocasionado que los caminos se encuentren en mal estado y en muchas de las comunidades los comunarios cuentan con un comite pro caminos quienes precautelando el estado del camino, trancan los caminos, es decir cierran en caminon con cadenas, para evitar la circulacion de vehiculos en epocas de lluvia.

    Es por esta razon, que se suspendieron los talleres planificados para el 26 y de Junio.

  • Katie Chandler of Etta Projects
    • confidential
    Implementation Status: in_progress Wed 19 Jun 2013, Almost 11 Years ago

    May Progress Report

    In May the workshop "How are we living?" has been developed in the community and at the school. Currently, the delays in implementing more training activities in the communities are a result of two reasons: first, there were nation wide road blockages during May as part of a protest; second, access to the community was inhibited by substantial rains rendering the roads impassable.

    With respect to CAPyS, they received further training and administration on the water system to complement their April training session in Cochabamba. This training focused on the role of each individual within CAPyS and also on the filling out of the vouchers used to administer the water system.

    During this month, the five CAPyS members reviewed the above mentioned activities, however, unfortunately not all could attend because they were working for harvest time.

    Other objectives reached included:
    • Assessment of the baseline level of the knowledge, practice, and caution of basic sanitation within the community
    • Holding workshops on sanitation education with the general community
    - Participating in the general assembly of community to verify the list of 38 families that are registered to be beneficiaries of the water system

    Social conflicts over the pension law occurred that blocked the roads and led to non-compliance with program activities in the Integrated North of the district of Montero. This created significant delays and the program schedule had to be adjusted accordingly. Consequently, training activities in the community have not developed according to plan.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 18 Jun 2013, Almost 11 Years ago

    CONFIRMAR TALLER

    Se realizaron llamadas al Sr. Nicolás Mamalli, Bruno Mamalli no hubo respuesta los celulares estaban fuera de área, se llamo al Sr. Pablo Pérez no contesto su celular, se revisó la agenda de contactos y se llamó a uno de los profesores de la unidad educativa Prof. Luiz Durán Cuellar estas llamadas tenian el propósito de confirmar el taller y si la comunidad fue convocada. El profesor manifestó que vío a Don Nicolás Mamalli invitando a la comunidad.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 18 Jun 2013, Almost 11 Years ago

    TALLER CAPyS

    Hoy se realizó un taller con los miembros del CAPyS y comunarios, con el objetivo de fortalecer sus conocimientos en cuanto al manejo de recibos de ingresos y egresos, libro diario, y lectura de medidores.

    Asi como tambien se trabajo con la comunidad en pleno, para socializar la importancia del trabajo en equipo, los roles y responsabilidades de los miembros del CAPyS, y la importancia del control sociall en la administracion del Sistema de Agua.
    Cabe informar que después de concluir con el taller el Sr. Nicolás Mamalli Tesorero del CAPyS manifestó verbalmente su renuncia al cargo por razones que tiene otro cargo dentro del sindicato de la comunidad y es mucha responsabilidad para él y sobre todo el tiempo no le da, en virtud a esto se eligió a la Sra. Sabina Aguirre Flores, de igual forma se vió pertinente ante la falta de compromiso del Sr. Pablo Perez quién era el secretario del comité reemplazarlo por la Sra. María Mamani. Se aclara que el Sr. Pablo Perez tiene lote en la comunidad pero no recide en la misma ya que vive en una comunidad aledaña a Nueva América llamada 4 de marzo. Él mismo en fecha 29 de mayo manifestó a la coordinadora del Proyecto de Agua que no podría asistir a las reuniones porque tenía muchos compromisos. Sin embargo en la asamblea general de la comunidad realizada en fecha 30 de mayo asitió y ratificó su cargo dentro del CAPyS. Pero se palnificaron actividades para el mes de junio dónde se lo llamaba para convocarlo pero núnca constestó su celular y desde aquella fecha no vino a las reuniones y talleres.
    El Sr. Bruno Mamalli en una conversación que sostuvimos manifestó que como el Sr. Perez tiene su lote en la comunidad el asiste a las asambleas generales de la comunidad la misma que acostumbran realizar el día 30 de cada mes, y en una de estas reuniones fue que se eligió al CAPyS y los comunarios que viven en Nueva América no se manifestaban para asumir cargos donde él voluntariamente se ofreció, pero al parecer cuando viajamos a Cochabamba al taller el sólo vió sus interes personales conocer sobre los sistema de agua que ofrece la empresa Plastiforte ya que es un hombre que tiene recursos económicos.
    También este día se eligío a la Sra. Paola Aguirre Flores como la vocal del CAPyS ya que no se contaba con este cargo.
    El Señor Edwin Borda Morales segundo Plomero del CAPyS no es de la comunidad Nueva América sino de 4 de Marzo participó en el taller de Cochabamba pero desde aquel entonces no se presentó a ninguna de las capacitaciones y reuniones que se sostuvieron en Nueva América a pesar que fue convocado por el presidente del CAPyS Sr. Bruno Mamalli. Actualmente ya no se lo toma en cuenta. El CAPyS sólo cuenta con un plomero que es el Sr. Clemente Rivera.

    • DSCN7813...
    • DSCN7814...
    • DSCN7815...
    • DSCN7817...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 17 Jun 2013, Almost 11 Years ago

    Trabajo en oficina forrado de materiales

    Hoy con el apoyo de Jessi Voluntario de Etta Projects se forraron con plástico transparentes el material educativo ( formatos administrativos), elaborados en cartulina, esto con el fin de que los mismos sean utilizados en futuros proyectos de agua.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Sat 08 Jun 2013, Almost 11 Years ago

    REUNION PLASTIFORTE

    Se efectuo una reunion telefonica con el Arq. Alvaro Lopez de Plastiforte, en la que se nos hizo conocer que no se podra implementar el sistema a fin de mes debido a:

    1º por las modificaciones en cuanto a los usuarios que habrán, debido a que en la ulltima reunion se incremento el numero de beneficiarios.
    2º por el hecho de que Plastiforte no cuenta con el plano en autocad v.2010 como lo solicito en la ultima reunion, razon por la cual se explico que ya hicimos llegar esta informacion al departamento de proyectos y que ellos nos haran llegar los planos solicitados en 15 dias habilies y que inmediatamente recibamos los planos se enviara a Plastiforte.

    Finalmente, Plastiforte, indico que considera que una muy importante solución a posibles eventualidades que podrían generarse con este proyecto de Nueva América, es contar con la presencia de EP y el Municipio en Plastiforte y a manera de reunirnos con el dpto. de proyectos, se establezca a detalle y mutuo acuerdo los alcances del proyecto, se establezca fechas de provisión, formas de pagos, partes y otros que son muy importantes para estos casos.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 05 Jun 2013, Almost 11 Years ago

    ADECUACIÓN DEL ROTAFOLIO DE EDUCACIÓN SANITARIA QUE SE UTILIZARÁ PARA LOS TALLERES CON NIÑO Y NIÑAS Y COMUNIDAD EN GENERAL DEL PROYECTO DE AGUA

    Los días 04 y 05 de junio se revisó el rotafolio o guía de Educación Sanitaria del proyecto de agua elaborado por la Prof. Elvira Quispe con el asesoramiento de Katie Chandler , la misma se adecuó tomando en cuenta los 6 temas en los cuales se capacitará a la unidad educativa y comunidad en general. Se adjunta la guía.

    • GU_A_DE_...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 03 Jun 2013, Almost 11 Years ago

    REMISION DE CROQUIS Y LISTA DE BENEFICIARIOS AL MUNICIPIO DE SANTA ROSA

    En fecha 3 de Junio, se envio la lista de beneficiarios y ubicacion de las casas al Municipio, con el objetivo de que el departamento de proyectos del municipio y Catastro, puedan elaborar un plano digital en Autocad, para ser enviado a Plastiforte y de esta manera determinar la fecha de implementacion del sistema, se ha elaborado una nueva lista, y un nuevo croquis, debido a que el numero de famiias beneficiarias ha aumento en la comunidad de Nueva America.

    La elaboracion del plano, demorara 15 dias, y el compromiso del alcalde es que en 15 dias habiles se entregara el levantamiento topografico y el plano en formato digital, para ser remitido a la empresa ejecutora.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 30 May 2013, Almost 11 Years ago

    REUNION COMUNITARIA NUEVA AMERICA

    En fecha 30 de Mayo, se realizo una asamblea comunitaria, con la participacion de todas las familias participantes del proyecto, en esta asamblea, se redacto la lista de beneficiarios, ubicacion de las viviendas, asi como tambien se aclaro la contraparte de las familias y se planifico con los comunarios las tareas y compromisos asumidos por ellos, para beneficiarse del proyecto.

    Al mismo tiempo, se retroalimento a la comunidad en pleno sobre las responsabilidades del CAPyS.

    • DSCN7622...
    • DSCN7625...
    • DSCN7626...
    • DSCN7623...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 29 May 2013, Almost 11 Years ago

    TALLER EN UNIDAD EDUCATIVA

    En fecha 29 de Mayo, se realizó el Primer Taller con los estudiantes de la Unidad Educativa de la comunidad.

    El objetivo del taller era reflexionar con los estudiantes e identificar la forma en la que estan viviendo en la comunidad.

    El resultado de este taller, fue la participación del 100% (12) de los niños y 100% (2) maestros de la unidad educativa, se logró reflexionar sobre como actualmente estan viviendo y los niños reconocierón las situaciones de riesgo y contaminación en relación al agua, alimentos, animales e higiene que hay en sus propias casas.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 28 May 2013, Almost 11 Years ago

    Trabajo en oficina elaborando Material Educativo

    Los días 27 y 28 de mayo se elaboraron los materiales educativos como formatos de recibos (ingreso y egreso), kardex de usuario, registro de socios, lectura de medidores y otros. Esto se elaboró en pliegos de cartulina blanca el material educativo se utilizará en las capacitaciones prácticas en administración del sistema de agua al Comité de Agua Potable y Saneamineto ( CAPyS).

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 27 May 2013, Almost 11 Years ago

    PLANIFICACIONES PARA TALLERES

    El día de hoy se elaborarón planificaciones de actividades que se desarrollarán en los dos talleres que se brindarán en la comunidad Nueva América. Se adjuntan las planificaciones

    • PLANIFIC...
    • PLANIFIC...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 21 May 2013, Almost 11 Years ago

    LINEA DE BASE

    En fecha 21 de Mayo, se visito la comunidad de Nueva America, para establecer la linea de base, con el objetivo de conocer las practicas y conocimientos en relacion a Saneamiento Básico en la comunidad.

    El resultado que se obtuvo de esta visita, fue que se realizo la visita domiciliaria y levantamiento de linea de base en 17 casas, en 13 se establecio la encuesta y observacion y en 4 solo observacion, debido a que no se encontraba nadie en la viviendas.
    Se contó con el apoyo técnico de la Lic. Penny Nixon Directora Etta Projects en los Estados Unidos, Lic. Matt Clements Gerente de Etta Projects en Bolivia y el Sr. Bismark Moreno Coordinador Técnico Proyecto de Baños Ecológicos Secos.

    • P5210471...
    • P5210477...
    • P5210459...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 20 May 2013, Almost 11 Years ago

    REVSIÓN FINAL Y APROBACIÓN DE LOS INSTRUMENTOS PARA LÍNEA DE BASE.

    Con el apoyo de la Lic. Katie Chandler se revisarón los instrumentos para el levantamiento de la línea de base los mismos fueron mejorados y aprobados para la aplicación. Adjunto los instrumentos.

    • FORMULAR...
    • GUIA_DE_...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Wed 15 May 2013, Almost 11 Years ago

    Cancelación de reunión de planificación con la comunidad

    Hoy teníamos que llevar a cabo la reunión con la comunidad Nueva América y el CApyS para elaborar el cronograma de todas las actividades del proyecto, pero por los conflictos sociales por la Ley de Pensiones, se han levantado bloqueos de carreteras troncales en casi todos los departementos de Boliva la misma se tuvo que cancelar hasta que se suspendan las medidas de presión como los bloqueos.

    • P5180361...
    • P5180365...
    • P5180370...
    • P5180375...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 14 May 2013, Almost 11 Years ago

    SOLICITUD DE INFORMACION AVANCE DE PROYECTO PLASTIFORTE

    Se realizara una llamada telefonica a Plastiforte, para solicitar informacion acerca del avance del Proyecto y las fecha de ejecucion de obras en la comunidad Nueva America

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 06 May 2013, Almost 11 Years ago

    ELABORACIÓN DE INSTRUMENTOS PARA LA LÍNEA DE BASE

    Los días 06 y 07 de mayo se elaboraron los instrumentos como guía de encuesta y guía de observación para el levantamiento de la línea de base los mismos que se utilizarán para el proyecto de agua y saneamiento como también para el proyecto de los Baños Ecológicos Secos que se está implementando en comunidades del municipio de Mineros. Adjuntos los instrumentos.

    • FORMULAR...
    • GUIA_DE_...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 02 May 2013, Almost 11 Years ago

    INFORME DEL MES DE ABRIL

    Hoy día se elaboró el informe de actividades realizadas durante el mes de abril. Adjunto el mismo

    • Informe_...
  • Katie Chandler of Etta Projects
    • confidential
    Implementation Status: in_progress Wed 01 May 2013, Almost 11 Years ago

    April Monthly Report

    Highlights of the month:
    • Introduction of new staff member, Coordinator of the Water, Sanitation, and Composting Latrine Projects- María Edilda Tipa Roca.
    • Workshop: Roles & Responsibilities of CAPyS (Water and Sanitation Committee Training Maual) by Maria Edilda Tipa Roca under Dilma’s supervision.
    • Other important activities included a training about the structure and responsibilities of CAPyS in administering the water system in Nueva America. This training took place in the city of Cochabamba.

    Please see attachment for a full monthly report

    • April_Wa...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Fri 26 Apr 2013, Almost 11 Years ago

    Capacitación Técnica en Plastiforte

    En instalaciones del Plastiforte - Cochabamba el CAPyS y personal de Etta Projects recibimos la capacitación técnica con respecto a la instalación de tuberías HDPE, plomería y accesorios que se utilizaran en el sistema de agua que se implementará en la comunidad Nueva América.

    La capacitación fue práctica estuvo dirigida por el Ing. Juan Carlos Camacho Responsable de Ventas de Plastiforte.

    • P4260032...
    • P4260055...
    • P4260077...
    • P4260086...
    • P4260089...
    • P4260131...
    • P4260134...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 25 Apr 2013, Almost 11 Years ago

    Capacitación estructura y responsabilidad del CAPyS

    Retomamos el taller de capacitación a las 19:30 hasta las 23:30 la Ing. Dilma dío a conocer cada uno de los formularios que ayudaran en el proceso de una buena administración del sistema de agua que se implementará en la comunidad de Nueva América el taller fue práctico se realizaron ejemplos del llenado de los diferentes formularios: kardex de socios, libro diario, recibos de ingreso y egreso y otros.

    Los miembros del CAPyS dijeron estar muy satisfechos con la capacitación ya que manifestaron que no hay por donde perderse... sin embargo se les comunicó que durante el proceso de la puesta en marcha del sistema se los apoyará en campo.

    El taller se realizó en el Hostal Internacional donde estabamos hospedados.

    • fotograf...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 25 Apr 2013, Almost 11 Years ago

    Taller de capacitación estructura y responsabilidades del CAPyS

    Llegamos a la Ciudad de Cochabamba con 2 horas de retraso debido al mal estado de la carretera en el trayecto denominado "El Sillar", luego del desayuno a horas 9:00 nos dirigimos al Edificio Confort donde desarrollamos el taller con el CAPyS.

    Los objetivos de taller fueron:

    - Capacitar al comité de agua potable y saneamiento en administración del Sistema de Agua Potable.
    - Aprender a manejar los recursos económicos provenientes de la administración Sistema de agua potable y saneamiento.
    - Aprender a llenar correctamente los formularios que ayudarán a controlar el manejo del Sistema de Agua Potable y Saneamiento.

    El taller fue agradable los participantes se sientieron en confianza rompimos el hielo realizando la técnica de presentación “Conociéndonos en parejas”
    Nos distribuimos en pareja donde intercambiamos un dialogo de conocimiento general de cada uno o una para conocernos mejor de dejo un margen de 5 minutos luego cada participante presentó su pareja.

    Posteriormente se realizó la lectura de los objetivos del taller los mismos que se detallan arriba.
    Luego se prosiguió el avance del taller de acuerdo a la guía metodológica elaborada para tal efecto se trabajo hasta la 13:45.
    Debido al cambio del clima y al viaje que fue extenso el grupo se sentia muy agotado por lo que acordó retomar el taller a las 18:00. En el Hostal Internacional.

    • Fotograf...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 23 Apr 2013, Almost 11 Years ago

    REUNION COMITE DE AGUA NUEVA AMERICA - PLASTIFORTE

    Se mantuvo una reunion telefonica con el CAPyS de Nueva America, para verificar la fecha del viaje, en esta reunion se coordino que se realizara la capacitacion en Cbba, del 24 al 26 de Abril.

    Inmediatamente se procedio, a la reserva nuevamente del hotel, y a la coordinacion con Plastiforte.

    Con Plastiforte, se determino que la capacitacion, se realizara el diva 25 de Abril, en instalaciones del Edificio Confort y el dia 26 de Abril en instalaciones de Plastiforte,.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 15 Apr 2013, Almost 11 Years ago

    REUNION COMITE DE AGUA NUEVA AMERICA

    Se mantuvo una reunion con el Sr. Nicolas Mamalli, miembro del Comite de Agua de Nueva America, para planificar la nueva fecha del viaje a la ciudad de Cochabamaba, desafortunadamente en esa reunion los miembros del CAPyS, manifestaron, que no pueden viajar antes del 24 de Abril, debido a que se encuentra en epoca de cosecha, asi como tambien se encuentran realizando la medicion con GPS de su comunidad.

    En esta reunion, el CAPyS, se comprometio a tener una reunion para organizar y planificar sus actividades y confirmarnos la fecha de la capacitacion.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 11 Apr 2013, Almost 11 Years ago

    Elaboración en PowerPoint material educativo para la capacitación al CAPyS.

    Del 10 al 11 de abril del año en curso se elaboró la presentación en PowerPoint material educativo que se utilizará en el taller de capacitación al CAPyS a realizarse el 25 y 26 de abril. Se adjunta el material.

    • PRESENTA...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 09 Apr 2013, Almost 11 Years ago

    GUÍA METODOLÓGICA PARA EL TALLER AL CAPyS

    Se elaboró la guía metodológica para la capacitación al Comité de Agua Potable y Saneamiento (CAPyS). Se adjunta la misma

    • GUIA_PED...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 09 Apr 2013, Almost 11 Years ago

    REUNION CON PLASTIFORTE

    Me comunique con Plastiforte, para comunicar que no podremos asistir a la ciudad de Cochabamba, debido a que los miembros del CAPyS de Nueva America, no pueden salir de la comunidad por el mal estado del camino, tambien nos informaron que hay problemas en la carretera que une Cochabamba-Santa Cruz, en el tramo del sillar, donde se han registrado derrumbes y las flotas(transporte terrestre) se encuentran pasando por horarios, de acuerdo al trabajo que realiza el servicio de caminos.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 08 Apr 2013, Almost 11 Years ago

    ELABORACIÓN DEL MODULO DE CAPACITACIÓN EN ADMINISTRACIÓN DEL SISTEMA DE AGUA NUEVA AMÉRICA

    A partir del 07 al 08 de abril se elaboró el módulo de capacitación en administración del sistema de agua y responsabilidades del Comité de Agua Potable y Saneamiento (CAPyS). Se adjunta el módulo elaborado

    • MANUAL_C...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Sun 07 Apr 2013, Almost 11 Years ago

    REUNION TELEFONICA PRESIDENTE CAPYS NUEVA AMERICA

    Hablamos telefonicamente con el Presidente del CAPyS, quien nos manifesto que desafortunadamente por las constantes lluvias de los ultimos dias, no pueden salir de la comunidad, el transporte publico que es el micro, no esta ingresando debido al mal estado del camino.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Fri 05 Apr 2013, Almost 11 Years ago

    INFORME MENSUAL PROYECTO DE AGUA

    II. INTRODUCCIÓN

    2.1 REUNIONES DE COORDINACION REFERENTES AL PROYECTO
    Durante el mes de Marzo o se realizaron reuniones con diferentes socios y actores involucrados en la implementación del proyecto, de acuerdo al siguiente detalle :

    a)Con autoridades del Municipio de Santa Rosa : Se realizaron reuniones con el alcalde y autoridades municipales con el objetivo de continuar con el proceso de implementación del proyecto de agua para la comunidad de Nueva América. El resultado de estas reuniones fueron :

    a.Seguimiento al proceso de Firma de Convenio con el Municipio, se nos informo que el Departamento se encuentra elaborando la ficha ambiental para adjuntar al proyecto de Nueva America.
    b.Se obtuvo en formato digital los planos y levantamientos topográficos en formato digital.

    b) Con autoridades y Comunarios de Nueva América

    Se realizaron 2 diferentes reuniones :

    1) Con los miembros del Comité de Agua de Nueva América; con el objetivo de planificar la capacitación a realizarse en la ciudad de Cochabamba, los días 10, 11 y 12 de Abril, al mismo tiempo explicar las características de la capacitación y la temática de los mismos.
    2) Solicitar informacion acerca de la instalación del medidor trifásico en la comunidad de Nueva America, los resultados de esta reunión fueron: conocer que la comunidad inicio el proceso y estan comprando los materiales para la construcción de la pilastra.,
    3) Con los comunarios de Nueva America: en fecha 29 de Marzo, se realizo una asamblea comunitaria, con la participación de todas las familias de Nueva America, con el objetivo de informar acerca de los avances del proyecto, asi como también de la participación de los miembros del CAPyS en una capacitacion a realizarse en la ciudad de Cochabamba del presentar el proyecto a al 12 de Abril.

    En esta reunión, nuevamente se remarco sobre el compromiso y contrapartes de la comunidad :

    a. La comunidad decidió que su contraparte será la mano de obra no calificada en la excavación de zanjas, cancelar el costo de materiales e instalación de la acometida domiciliaria y el medidor.
    b. Autorizo la participación en la capacitacion en la Ciudad de Cochabamba del 10 al 12 de Abril, de los miembros del CAPYS, el cual esta conformado por :
    Sr. Bruno Mamalli Presidente
    Sr. Pablo Perez Vice Presidente
    Sr, Nicolas Mamalli Secretario y Tesorero
    Clemene Rivera Plomero
    Sr. Edwin Borda Plomero

    4) Con el PROASU – JICA y MINISTERIO DE MEDIO AMBIENTE Y AGUA

    Se realizo, conjuntamente con el PROASU-JICA un mantenimiento del pozo y un aforo, cuyos informes se recepcionaron y se adjuntan al presente informe.

    5) Reuniones con PLASTIFORTE

    Se han realizado distintas reuniones con Plastiforte, las cuales se pueden resumir de la siguiente manera:

    Se tuvo una conversación con el Arq. Lopez, quien nos manifestó que es necesario que enviamos una copia digitalizada del plano topográfico en autocad a PLASTIFORTE, también se nos solicito un mapa de ubicacion con distancias, tipos de camino y accesibilidad para programar la implementacion del sistema. El resultado de esta reunión fue : Enviamos mapa de acceso vial del municipio de Santa Rosa, y descripción de la accesibilidad a la comunidad.

    Al mismo tiempo se confirmo las fechas de capacitacion en la ciudad de Cochabamba para los días 10 al 12 de Abril, esta capacitacion estará a cargo de Etta Projects y Plastiforte, se realizara en instalaciones de Plastiforte, con asistencia de 1 representante del municipio y el CAPyS de Nueva America.

    Se mantuvo una reunión telefonica con el Ing, Alejandro Heredia, con el objetivo de conocer y verificar los avances sobre la propuesta final del proyecto, al mismo tiempo re confirmar la capacitación para los dias 11 y 12 de abril en instalaciones de PLASTIFORTE.
    En esta reunión se nos solicito, hacer llegar una copia de planos digitales, en otro formado, lamentablemente por el tamano del archivo y mala calidad, no se pudo enviar y quedamos que el dia 11 que participemos de la capacitacion se hara entrega de 1 CD con estos planos digitales.

    Se ha enviado a PLASTIFORTE los informes recibidos del PROASU JICA, los cuales son los siguientes :

    • Informe de prueba de bombeo,
    • Ensayo de Bombeo
    • Informe de Análisis de Agua
    • Informe de Laboratorio

    III. DESCRIPCIÓN DE LAS ACTIVIDADES PROGRAMADAS Y REALIZADAS

    • Actividades programadas que fueron ejecutadas.
    - Reuniones con el CAPyS
    - Asambleas Comunitarias
    - Reuniones con el Municipio y otras autoridades locales
    - Recepcion y Remision de informes del PROASU-JICA

    • Actividades programadas que no fueron completadas
    Desafortunadamente se tenia planificado contar con la cotización final de Plastiforte, lo cual no se pudo lograr debido a que ellos necesitan que se envié los planos en otro formato, se ha quedado con ellos de entregar 1 CD en formato solicitado con todos los planos en nuestra visita a Cochabamba.

    • Actividades realizadas que no fueron programadas
    Planificación y organización capacitación para el CAPyS en la ciudad de Cochabamba.

    • En caso de que las acciones realizadas, hayan producidos logros e impactos excepcionales, debe explicar, como impactarán en la toma de decisiones para la implementación del proyecto.

    • Describir cómo la Participación Comunitaria ha contribuido a la implementación del proyecto, en caso de que esta haya sido deficiente, debe decir como los motivará a participar en las actividades.

    Los lideres de la comunidad participaron en diferentes reuniones con autoridades municipales, CRE y otros con el objetivo de gestionar la instalación de un medidor trifásico. Al mismo tiempo, organizaron a la comunidad y se efectuó una asamblea comunitaria, en la cual presentamos los temas de capacitacion los temas y fechas de capacitacion en la ciudad de Cochabamba. La comunidad reafirmo su compromiso y contraparte y autorizo la participación de los miembros de CAPyS, en la ciudad de Cochabamba.

    • IV. PROGRAMACIÓN DE TRABAJO

    - Entrega de planos y otros en formato digital a PLASTIFORTE
    - Recibir Cotizacion Final de Plastiforte
    - Planificación y organización de materiales para capacitación del CAPyS
    - Capacitación a CAPyS en temas de: Torre Hidroneumatica, Plomeria, Medidores, Administracion del Sistema y otros.
    - Instalación de Medidor Trifásico
    - Realizar Diagnostico Participativo con la comunidad antes de iniciar la implementacion
    - Obtener datos para la línea de base, los cuales serán de conocimiento comunitario para partir de la realidad y motivar el cambio.

    VII ANEXAR:
    - Informes de PROASU-JICA
    - Planos de Nueva America
    - Informe Cronologico

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 04 Apr 2013, Almost 11 Years ago

    INDUCCIÓN PROYECTO DE AGUA NUEVA AMÉRCIA

    El día de hoy la Ing. Dilma Rodríguez Directora de Etta Projects, brindó información relacionada al Proyecto de Agua Nueva América a la Lic. María Edilda Tipa Coordinadora del Proyecto de Agua y Saneamiento.
    Brindó y facilitó materiales educativos para elaborar el módulo para la capacitación al Comité de Agua y Saneamiento CAPyS. A realizarse del 10 al 12 de abril del año en curso en la ciudad de Cochabamba

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 04 Apr 2013, Almost 11 Years ago

    PLANIFICACION Y ELABORACION DE MATERIALES CAPACITACION CBBA.

    Maria Edilda Tipa, facilitadora de este proyecto, se encuentra revisando, organizando, los materiales a utilizar, durante la capacitacion en la ciudad de Cochabamba.

    Plastiforte, realizara una parte de la capacitacion, relacionada al Sistema, Torre Hidroneumatica, Instalacion y Plomeria, durante la seciones de capacitacion, se tendra tambien talleres referentes a la administracion del sistema, los cuales estan a cargo del personal de Etta Projects.

    Es por esta razon que durante esta semana se planificara y elaborara las seciones correspondiente a EP.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 03 Apr 2013, Almost 11 Years ago

    REUNION ALCALDE DE SANTA ROSA

    Se efectuo una reunion con el Alcalde de Santa Rosa, con el objetivo de conocer acerca del avance de la aprobacion y autorizacion del Concejo para la Homologacion del Convenio firmado con el municipios de Santa Rosa, verificar la partida presupuestaria para la Contraparte del Municipio e informar acerca de la capacitacion en la ciudad de Cochabamba,

    En esta reunion, se pudo conocer que el concejo ya recibio el convenio, el cual sera analizado durante la proxima sesion de concejo a realizarse el 05 de Abril del ano en curso y que el Municipio ya cuenta con la partida presupuestaria para realizar el pago de la contraparte para la implementacion del proyecto.

    Solo nos queda esperar la aprobacion del concejo, e inmediatamente el municipio desembolsara la contraparte, siendo este, solo un proceso conforme a ley.

    Tambien recibimos nuevamente, la confirmacion del Alcalde, en que una persona, participara de la capacitacion a realizarse en la ciudad de Cochabamba,

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 01 Apr 2013, Almost 11 Years ago

    RESERVAS HOTEL - CAPACITACION CBBA.

    Se realizo la reserva para los miembros del Comite de Agua de Nueva America y personal de EP, la estadia sera en el Hostal Internacional, la reserva se realizo por 3 dias, ingresando el 10 de Abril por la manana, y saliendo el 12 de Abril, por la tarde.

    El viaje se realizara, el dia Martes 9 de Abril, a horas 22:00, via terrestre Bus Bolivar.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Thu 28 Mar 2013, About 11 Years ago

    REUNION CON PLASTIFORTE

    Se mantuvo una reunion telefonica con el Ing, Alejandro Heredia, con el objetivo de conocer y verificar los avances sobre la propuesta final del proyecto, al mismo tiempo re confirmar la capacitacion para los dias 11 y 12 de abril en instalaciones de PLATIFORTE.

    En esta reunion se nos solicito, hacer llegar una copia de planos digitales, en otro formado, lamentablemente por el tamano del archivo y mala calidad, no se pudo enviar y quedamos que el dia 11 que participemos de la capacitacion se hara entrega de 1 CD con estos planos digitales.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 25 Mar 2013, About 11 Years ago

    REUNION COMITE DE AGUA NUEVA AMERICA

    Se mantuvo una reunion con el Comite de Agua, para confirmar la fecha de capacitacion en la ciudad de Cochabamba, al mismo tiempo entregar una copia de la documentacion recibida del Gobierno Municipal de Santa Rosa, la cual sera presentada y socializada en una asamblea comunitaria el dia sabado 27 de este mes.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 20 Mar 2013, About 11 Years ago

    FECHA DE CAPACITACION PLASTIFORTE

    Se tuvo una reunion con el Arq. Lopez de Plastiforte, via telefono y con confirmacion via correo, de que la fecha de capacitacion en Plastiforte seria del 11 al 12 de Abril, el temario se nos enviara el dia lunes, y esta fecha esta sujeta a confirmacion previa reunion con la comunidad.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Tue 19 Mar 2013, About 11 Years ago

    SOLICITUD DE PLANOS MUNICIPIO DE SANTA ROSA

    Se solicito mediante carta al Municipio de Santa Rosa, la otorgacion a traves del Departamento de Proyectos y Catastro, los planos y levantamiento topografico en autocad en formato digital .

    Al finalizar el dia, el alcalde se comunico con nosotros para manifestar, que nos entregaran una copia el dia lunes 25 de Marzo.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 18 Mar 2013, About 11 Years ago

    REUNION CON PLASTIFORTE

    Se tuvo una conversacion con el Arq. Lopez, quien nos manifesto que es necesario que enviamos una copia digitalizada del plano topografico en autocad al PLASTIFORTE, tambien se nos solicito un mapa de ubicacion con distancias, tipos de camino y accesibilidad para programar la implementacion del sistema.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Wed 13 Mar 2013, About 11 Years ago

    REUNION ALCALDE DE SANTA ROSA

    El dia de hoy, mantuvimos una reunion con el Sr,. Manuel Yevara C. Alcalde de la Ciudad de Santa Rosa, con el objetivo de solicitar informacion acerca del avance de la firma de convenio del Municipio, se nos manifesto que el departamento de proyectos, esta presentando una ficha ambiental al concejo, para tal efecto.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Mon 11 Mar 2013, About 11 Years ago

    Envio Informe PROASU JICA a Plastiforte

    El dia de hoy, se envio via correo electronico al Arq. Alvaro Lopez e Ing. Natalia, ambos del departaento de Proyectos de PLastiforte, la informacion recepccionada del PROASU JICA, de acuerdo al siguiente detalle :

    -* Informe Prueba de bombeo
    -* Informe Analisis de agua
    - *Otros

    Al mismo tiempo via telefono nos comunicamos con el Arq. Lopez, quien nos manifesto que la ifnormacion esta siendo analizanda por el departamento de proyectos, y que en caso de solicitar mas informacion, nos comunicaran oportunamente.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Fri 08 Mar 2013, About 11 Years ago

    REUNION PROASU - JICA

    Se participo de una Reunion con el Ing. Joaquin Soria y el Tec. Hugo Serrate del PROASU-JICA, quienes nos hicieron entrega de :

    - Informe de prueba de bombeo, realizado al Pozo de Nueva America, Santa Rosa
    - Ensayo de Bombeo
    - Informe de Analisis de Agua del Pozo de Nueva America, Santa Rosa
    - Informe de Laboratorio

    • Ensayo_d...
    • Informe_...
    • Informe_...
    • Informe_...
    • Informe_...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Mon 04 Mar 2013, About 11 Years ago

    INFORME CORRESPONDIENTE AL MES DE FEBRERO

    I. IDENTIFICACIÓN DEL PROYECTO

    Nombre del Proyecto: PROYECTO DE AGUA, COMUNIDAD NUEVA AMERICA DE SANTA ROSA DEL SARA.

    II. INTRODUCCIÓN (Elaborar un resumen del contenido del informe, destacando las actividades y los resultados más relevantes):

    2.1 REUNIONES DE COORDINACION Y PRESENTACION DEL PROYECTO

    Durante el mes de Febrero se realizaron reuniones con diferentes socios y actores involucrados en la implementación del proyecto, de acuerdo al siguiente detalle :

    a) Con autoridades del Municipio de Santa Rosa : Se realizaron reuniones con el alcalde y autoridades municipales con el objetivo de continuar con el proceso de implementación del proyecto de agua para la comunidad de Nueva América. El resultado de estas reuniones fueron :

    a. Recepción del plano oficial y levantamiento territorial de la comunidad de Nueva America.
    b. Coordinación con el Departamento de Proyectos del Municipio, para la aprobación del informe técnico.

    b) Con autoridades y Comunarios de Nueva América

    Se realizaron 2 diferentes reuniones :

    1) Con las autoridades de Nueva America; con el objetivo de Socializar el plano recepcionado y determinar la ubicación de la red matriz, y coordinar una asamblea comunitaria. El resultado de estas reuniones fueron:
    1. Los lideres comunitarios aprobaron el levantamiento territorial que se realizo en la comunidad, aprobaron los planos recepcionados de Catastro.
    2. Se fijo fecha para realizar la asamblea comunitaria y socializar el borrador de convenio con el municipio.

    2) Con los comunarios de Nueva America: se realizo una asamblea comunitaria, con la participación de todas las familias de Nueva America, con el objetivo de presentar el proyecto a la comunidad, identificar los compromisos y contrapartes, hacer un levantamiento de beneficiarios y otros. Los resultados de esta asamblea fueron :
    a. La comunidad decidió que su contraparte será la mano de obra no calificada en la excavación de zanjas, la acometida domiciliaria y el medidor.
    b. La comunidad selecciono democráticamente a los miembros del CAPYS, el cual esta conformado por :
    Sr. Bruno Mamalli Presidente
    Sr. Pablo Perez Vice Presidente
    Sr, Nicolas Mamalli Secretario y Tesorero
    Sr. Clemene Rivera Plomero
    Sr. Edwin Borda Plomero
    c. Se realizo la lista de beneficiarios, y se identifico la ubicación de las acometidas domiciliarias en el plano que nos entrego el municipio, con el objetivo de enviarlo a Plastiforte, para que ellos determinen el diseño de la red de distribución.
    d. Se conto con la participación de la Defensoría de la Mujer, nin@ y adolescente, para sensibilizar a la comunidad sobre la importancia de la participación de las mujeres.

    c) Se realizo 1 reunion telefónicas con el Arq. Alvaro Lopez del departamento de Proyectos, con el objetivo de enviar parte de la informacion con la que ya contamos y continuar el proceso de la elaboración del proyecto técnico a diseño final.

    3) Con el PROASU – JICA y MINISTERIO DE MEDIO AMBIENTE Y AGUA

    Se realizo, conjuntamente con el PROASU-JICA un mantenimiento del pozo y un aforo, los resultados del aforo fueron los siguientes:

    Nivel Estatico : 12,70 mts.
    Nivel Dinamico : 18,18 mts.
    Caudal : 42 lts/seg 14,400 lts/hora

    Los resultados oficiales se harán llegar en un informe la primer semana de Marzo, al Municipio y Etta Projects.

    • Actividades realizadas que no fueron programadas

    Con apoyo y participación de la Defensoría de la mujer, nin@ y adolescente, se realizo una charla de sensibilización a la comunidad con el objetivo de que la comunidad analice sobre la importancia de la participación de la mujer en actividades comunitarias y ejerciendo liderazgo. El resultado de esta actividad es que el comité de agua cuenta con 6 personas varones, los cuales viajaran a capacitarse a la ciudad de Cochabamba, pero que a su retorno se incorporaran 2 mujeres de la comunidad, las cuales no pueden viajar a Cochabamba, debido a que son madres y no pueden abandonar su hogar por algunos días.

    • Describir cómo la Participación Comunitaria ha contribuido a la implementación del proyecto, en caso de que esta haya sido deficiente, debe decir como los motivará a participar en las actividades.

    Los lideres de la comunidad participaron en diferentes reuniones con autoridades municipales, con el objetivo de gestionar la participación activa del municipio, al mismo tiempo, organizaron a la comunidad y se efectuo una asamblea comunitaria, en la cual presentamos el proyecto, la comunidad identifico su compromiso y contraparte y se inicio la planificación con ellos. Democraticamente la comunidad selecciono a los miembros del CAPyS, los cuales son los que harán el seguimiento a la ejecución del proyecto y estarán a cargo de la administración del Sistema de Agua.

    • INFORME_...
  • Katie Chandler of Etta Projects
    • confidential
    Implementation Status: in_progress Mon 04 Mar 2013, About 11 Years ago

    February Monthly Report In English

    Water Project: Nueva America community in Santa Rosa del Sara.
    February, 2013

    Meetings and Project Presentation

    During the month of February project staff met with various people involved with the implementation of the project:
    1. Authorities of the Santa Rosa Municipality: We met with the mayor and municipal authorities with the objective to continue the process of implementing the water project for the Nueva America community. The results were:
    a. Accept the official plan and choose the location for the well tower.
    b. Coordination with the Department of Municipal Projects for the acceptation of the technical report.
    2. Authorities and community members of Nueva America.
    a. Authorities of Nueva America:
    i. Community leaders approved the site location and approved the plans with the Land Registry.
    ii. We set the date for the next community meeting and set up a draft agreement with the Municipality.
    b. Community members of Nueva America:
    i. Held a community gathering with the participation of all of the Nueva America families, with the objective to present the project to the community, identify the commitment and partnerships and complete a survey of the beneficiaries. The meeting achieved the following results:
    1. Families confirmed their agreement to contribute manual labor for digging the trenches, plus a financial contribution of the connection at home and the meter for monitoring water usage.
    2. The community democratically selected the members of CAPYS:
    a. Sr. Bruno Mamalli- President
    b. Sr. Pablo Perez- Vice President
    c. Sr. Nicolas Mamalli- Secretary and Treasurer
    d. Sr. Clemene Rivera- Plumber
    e. Sr. Edwin Borda- Plumber
    3. Created a list of the beneficiaries and identified the well distribution areas so that Plastiforte could approve them and incorporate them into his final design of the well distribution system.
    4. Counted on the participation of the women’s protection group, a group of girls and adolescents to educate the community about the importance of the participation of women.
    c. Held a meeting with architect Alvaro Lopez in the Projects Department, with the objective to pass along the information that we collected and to continue the process of elaborating and finishing the project’s final technical design.
    3. With PROASU-JICA and the Ministry of Water and Environment
    We achieved, in conjunction with the PROASU-JICA, well maintenance and testing. The results of the testing were the following:
    1. Static level: 12.70 meters
    2. Dynamic Level: 18.18 meters.
    3. Flow: 42 liters/second and 14,400 liters/hour.
    The official results will arrive in a report to the Municipality and Etta Projects the second week in March.

    With support from the Defense of the woman, girls, and adolescents, the project spoke about raising awareness in the community in order to analyze the importance of the participation of women in community activities and leadership exercises. The result was that the water committee is comprised of six males who will travel to the city of Cochabamba for training. When they return, however, the committee will incorporate two women from the community that are not able to attend the meeting because they decided they could not leave their families or their household duties during the training.

    The leaders of the community participated in different meeting the municipal authorities in order to manage the active participation of the municipality while at the same time organizing the community. This organization included a community gathering where we presented the project, the community identified their commitments and partners, and began the planning with them. The community democratically selected the members of CAPYS that will help with the project implementation and will be responsible for the administration of the water system.

  • Implementation Phase Project started on 1 Mar, 2013 Preparation Phase
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed_partial Thu 28 Feb 2013, About 11 Years ago

    REUNION COMUNITARIA NUEVA AMERICA

    El dia 28 de Febrero, participaremos de una Asamble Comunitaria en Nueva America, con el objetivo de informar a la comunidad sobre la planificacion y avances del proyecto.

    Socializar la importancia de la eleccion del CAPYS, las responsabilidades y obligaciones y conjuntamente elegir a los miembros del CAPYS, promoviendo la participacion de las mujeres.

    Socializar el aporte comunitario y contraparte de cada familia.

    Tambien en esta asamblea se contara con la presenia del Muncipio para poder realizar la medicion de la red matriz y de esta manera enviar la documentacion respectiva a PLASTIFORTE.
    ***
    El dia de hoy, se realizo la reunion comunitaria con la participacion de 28 familias, se socializo con ellos la importancia de contar con un CAPyS, y la forma en la cual la comunidad deberia elegir democraticamente, despues de esta socializacion, la comunidad determino que el CAPyS este conformado por :
    Sr. Bruno Mamalli Presidente
    Sr. Pablo Perez Vice Presidente
    Sr, Nicolas Mamalli Secretario y Tesorero
    Sr. Clemene Rivera Plomero
    Sr. Edwin Borda Plomero

    Durante esta reunion se determino que el Sr. Nicolas Mamalli ocuparia la cartera de Tesorero y Secretario, temportalmente, por que mas adelante de invitara a que participe alguna mujer dentro del Comite de Agua, durante esta reunion ninguna de las Senoras dijo tener tiempo, pero asumieron su responsabilidad y que mas adelante ellas tambien seran parte del comite.

    Se identifico las conexiones domiciliarias que se realizan y se marco dentro del Plano que nos entrego el municipio, con el objetivo de enviarlo a Plastiforte, para que nos hagan llegar la cotizacion a diseno final.

    Tambien, se conto con la participacion de la Defensoria de la Mujer, ninez y adolescencia, con el objetivo de que los psicologos y personal de esta institucion puedan brindar un taller a la comunidad para motivar y promover la importancia de la participacion de las mujeres.

    La comunidad en pleno determino que se realizara la instalacion de un medidor trifasico durante el mes de marzo y que esto sera una contraparte comunitaria,

    • Febrero_...
    • Febrero_...
  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Fri 22 Feb 2013, About 11 Years ago

    INFORME PROASU JICA - POZO NUEVA AMERICA

    En fecha 22 de Febrero, nos comunicamos con el Ing. Marco Serrate, del Proasu - JICA, responsable de realizar el mantenimiento y aforo del pozo en Nueva America. Se nos comunico de que ya se realizo el mantenimiento, y de que el pozo esta en perfecto estado y listo para poder iniciar el bombeo.

    Se realizo el aforo del mismo y los resultados fueron los siguientes:

    Nivel Estatico : 12,70 mts.
    Nivel Dinamico : 18,18 mts.
    Caudal : 42 lts/seg 14,400 lts/hora

    El informe sera enviado oficialmente al municipio de Santa Rosa durane la primera semana de Marzo.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: completed Tue 19 Feb 2013, About 11 Years ago

    Planos Oficiales de la Comunidad

    Se mantuvo una reunion con la Direccion de Proyectos del Municipio de Santa Rosa y la Oficina de Catastro, con el objetivo de recepcionar el plano oficial y levantamiento territorial de la comunidad Nueva America.

    Tambien se socializo con los lideres de la comunidad el Plano recepcionado y se dispuso realizar una asamblea comunitaria con el objetivo de determinar la ubicacion de la red matriz y socializar la eleccion del CAPYS y aporte comunitario.

    • Plano_Of...
    • Fotos_Re...
  • Katie Chandler of Etta Projects
    • confidential
    Implementation Status: in_progress Sat 02 Feb 2013, About 11 Years ago

    January Monthly Report in ENGLISH

    Nueva America Water Project, January 2013

    I. PROJECT

    Name of Project: WATER PROJECT, COMMUNITY OF NUEVA AMERICA DE SANTA ROSA DEL SARA

    II. INTRODUCTION (Activities and Results):

    2.1 COORDINATION MEETINGS AND PRESENTATION OF THE PROJECT

    In January we had several meetings with different partners and actors that are involved in the implementation of the project:

    a) Authorities of the Municipality of Santa Rosa

    We had four different meetings with the mayor, council, and other municipal authorities, with the objective of presenting and coordinating the project. The results of the meetings were:
    1. Letter of intent (LOI) signing agreement (sent by the Municipality of Santa Rosa)
    2. Started the Budget Process for the project and looked at the contribution of the municipality as part of their annual operating plan

    b) Authorities and Community leaders of Nueva America

    We had two different meetings with the authorities and leaders of Nueva America, with the objective of presenting and coordinating the project. The results of the meetings were: Se realizaron 2 diferentes reuniones con las autoridades y lideres de Nueva America; con el objetivo de presentar y coordinar el proyecto, el resultado de estas reuniones fueron:
    1. The community accepted the project and played a lead role in gaining support for the signing of the documents. They also were involved in completing a territorial community survey and elaborating on the plans for the community in partnership with the municipality, all with the objective of creating a final technical plan with Plastiforte.

    c) Plastiforte, the company assisting with technology and project design:

    We had two phone meetings with Alvaro Lopez and Ing. Natalia from the Project Department, to coordinate and determine what information Plastiforte needs from the community in order to start the design process for the hydroneumatic tower and get a price quote for the materials, transportation, and labor for the project. All of the required information will be sent to Plastiforte before February 11 so that the planning process can be continued.

    d) PROASU – JICA and the Ministry of Water and the Environment

    We had an informational meeting with PROASU – JICA, where we explained the technology that we will use. Members of the Ministry of Water and the Environment were also present at the meeting. They gave us a copy of the implementation guide for Water Projects for Small Communities (under 10,000 inhabitants) so that we could see what technologies they recommend and gave us advice on implementation. It was in this guide that we found information on the hydroneumatic tower. The guide also recommended certain instruments and monitoring tools that we will need to use as we go forward with our project.

    2.2 STUDY OF POTENTIAL PROBLEMS AND SOLUTIONS RELATING TO ELECTRICITY

    During the pilot project in Montegrande, similar to what we will be implementing in Nueva America, there were voltage problems resulting from rain and unreliable electricity currents, damaging the circuit breaker panel, which resulted in the community losing its water access for a day.

    We had a meeting between the different organizations and institutions that had been involved in resolving the problem in Montegrande in order to avoid issues these same problems with the project in Nueva America. We met with CRE (Rural Electricity Cooperative, the company that provides electricity), ELECTROGIS (company specializing in resolving problems relating to electricity), SAN RAFAEL (the company that installed the circuit breaker panel and the pump). Through these meetings we learned that the main problem in Montegrande was that the energy provision to the communities is not as reliable as in surrounding areas because they are not part of the main grid, and that the electricity coverage and voltage may fluctuate. In Nueva America, the service and coverage is much better. Because of this, after an in-depth analysis process, we decided that the community needed a nonconventional breaker panel and coils that can handle differing voltage levels, as well as the necessary grounding in order to prevent any accidental discharges. This was installed in Montegrande by a specialized contractor that is used to working in these types of circumstances, and will also be installed in Nueva America to prevent this issues.

    2.3 MONITORING AND EVALUATION INSTRUMENTS

    In accordance with the recommendations of the guide provided by the Ministry of Water and the Environment we have included information on the monitoring and evaluation tools that will be necessary for this project. See attachements.

    Please see Attachments for a more detailed monthly report (including chart of advancements and activity plans)

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Fri 01 Feb 2013, About 11 Years ago

    REUNION DE COORDINACION PROASU-JICA

    En fecha 1 de Febrero, se realizo una reunion con el Proasu-Jica, con el objetivo de Solicitar el mantenimiento al Pozo Perforado en la comunidad de Nueva America y al mismo tiempo realizar una aforo del mismo y prueba de Bombeo.

    En esta reunion se designo como responsables de este trabajo. al Ing. Marco Serrate y Tec. Hugo Salvatierra, los cuales se comprometieron realizar el mantenimiento y aforo del pozo antes de fin de mes. Una vez realizado el mantenimiento y aforo, el Proasu-Jica elevara un informe al Municipio de Santa Rosa.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Fri 01 Feb 2013, About 11 Years ago

    INFORME CORRESPONDIENTE AL MES DE ENERO

    I. IDENTIFICACIÓN DEL PROYECTO

    Nombre del Proyecto: PROYECTO DE AGUA, COMUNIDAD NUEVA AMERICA DE SANTA ROSA DEL SARA.

    II. INTRODUCCIÓN (Elaborar un resumen del contenido del informe, destacando las actividades y los resultados más relevantes):

    2.1 REUNIONES DE COORDINACION Y PRESENTACION DEL PROYECTO

    Durante el mes de Enero se realizaron reuniones con diferentes socios y actores involucrados en la implementación del proyecto, de acuerdo al siguiente detalle :

    a) Con autoridades del Municipio de Santa Rosa : Se realizaron 4 diferentes reuniones con el Alcalde, concejo y otras autoridades municipales; con el objetivo de presentar y coordinar el proyecto, el resultado de estas reuniones fueron:
    1. Carta de Intención de firma de convenio (enviada por el municipio de Santa Rosa)
    2. Inicio de Proceso de Presupuesto de POA para contraparte del proyecto

    b) Con autoridades y Lideres Comunitarios de Nueva America

    Se realizaron 2 diferentes reuniones con las autoridades y lideres de Nueva America; con el objetivo de presentar y coordinar el proyecto, el resultado de estas reuniones fueron:
    1. La Comunidad se identifico con el proyecto, al mismo tiempo que asumió un rol protagonista al apoyar la gestión de firmas de convenios, levantamiento territorial de la comunidad, elaboración de planos de la comunidad conjuntamente con el municipio, con el objetivo de tener el Prpyecto Tecnico a diseño final, por parte de Plastiforte.

    c) Con Plastiforte, empresa proveedora de la tecnología a utilizar

    Se realizaron 2 diferentes reuniones telefónicas con el Arq. Alvaro Lopez y la Ing. Natalia del departamento de Proyectos, con el objetivo de coordinar y determinar la información necesaria que debemos remitir para que el departamento de proyectos de Plastiforte, pueda iniciar el proceso de diseño final técnico de la torre hidroneumática y la cotización de materiales, transporte y mano de obra. Toda la información requerida se hará llegar a plastiforte, hasta el día 11 de febrero.

    d) Con el PROASU – JICA y MINISTERIO DE MEDIO AMBIENTE Y AGUA

    Se participo de una reunión informativa del PROASU – JICA, donde se explico la tecnología a utilizar, en la misma reunión participaron miembros del Ministerio de Medio Ambiente y Agua, quienes nos hicieron llegar una copia de la guía de implementación de Proyectos de Agua para Pequenas Comunidades, con el objetivo de que tomemos en cuenta la tecnologías recomendadas por ellos, en esta guía se encuentra la Torre Hidroneumatica.

    Dentro de esta reunión el Ministerio de Medio Ambiente y Agua nos hizo llegar la guía para poner en marcha proyectos de Agua y Saneamiento en comunidades pequeñas con menos de 10.000 habitantes, en la cual se encuentra una serie de instrumentos y herramientas de Monitoreo que se debe tomar en cuenta y pones en practica dentro de la ejecución del proyecto.

    2.2 ESTUDIO DE PROBLEMAS Y SOLUCIONES RELACIONADOS A ENERGIA ELECTRICA

    Dentro del Proyecto Piloto de Montegrande, similar al que se implementara en Nueva America, se ha tenido algunos inconvenientes por problemas de baja y alta tensión, dando esto como resultado danos en la bobina del tablero automatico, lo cual incide en que la comunidad pierda el sumministro de agua por aprox, 1 dia, en 4 meses, se tuvo 2 veces el mismo problema.

    Con el fin de precautelar que la comunidad de Nueva América, pueda presentar los mismos inconvenientes y tratando de dar solución a la comunidad de Montegrande, se decidió hacer una reunión interinstitucionales con las instituciones relacionadas al caso: CRE (Cooperativa Rural de Electrificación, empresa proveedora de energía eléctrica), ELECTROGIS (Empresa especializada en soluciones a problemas de Energía Eléctrica o Electrónica), SAN RAFAEL (Empresa proveedora de la bomba y tablero automatico). El resultado de estas reuniones permitió determinar que el tipo de energía que llega a las comunidades debido al tendido eléctrico que es demasiado precario, no ofrece una cobertura estable, la cobertura de energía eléctrica en el caso de Montegrande es demasiado precario, con muchas altas y bajas de tensión. En el caso de Nueva America, el servicio es mucho mejor, pero de todas maneras por estar alejadas en algún momento puede presentar un problema similar al de Montegrande.

    Por tal motivo, luego de un arduo análisis se determino, que dentro del tablero automático se debe colocar una bobina no convencional similar a otras comunidades, al contrario esta debe ser una bobina que tenga la capacidad de trabajar en alta y baja tensión, al mismo tiempo que se instalara un contactor especial que pueda trabajar en este tipo de circunstancias en compañía de un Rele y también con el respectivo aterramiento para evitar posibles descargas que puedan quitar la vita útil de tablero automático.

    2.3 ELABORACION DE INSTRUMENTOS DE MONITOREO Y EVALUACION

    De acuerdo a la guía proporcionada por el Ministerio de Medio Ambiente y Agua, adjunto al presente remito a usted una serie de herramientas de monitoreo y evaluación que pongo a consideración de usted para la implementación del presente proyecto.

    III. DESCRIPCIÓN DE LAS ACTIVIDADES PROGRAMADAS Y REALIZADAS

    3.1. Objetivos a alcanzar en el período (de los objetivos generales, cuáles se han podido lograr en este período)

    3.2. Resumen de las actividades programadas y realizadas (las actividades deben describirse específicamente por resultado, de acuerdo a lo expresado en el cuadro de reporte de avance):

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Tue 29 Jan 2013, About 11 Years ago

    coordinacion con Plastiforte

    Mantuvimos una reunión telefónica con el Arq. Alvaro Lopez de Plastiforte y la Ing. Natalia del departamento de Proyectos, para coordinar y determinar la información necesaria que debemos remitir para que el departamento de proyectos de Plastiforte, pueda iniciar el proceso de diseño final técnico de la torre hidroneumática y la cotización de materiales, transporte y mano de obra. Toda la información requerida se hará llegar a plastiforte, hasta el día 11 de febrero.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Mon 28 Jan 2013, About 11 Years ago

    visita de los lideres del proyecto

    Recibimos la visita de los lideres de Nueva America, quienes nos visitaron para conocer mas acerca del progreso del proyecto, y para hacernos conocer que ellos visitaran el municipio para agilizar la entrega de los planos y otros.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Thu 24 Jan 2013, About 11 Years ago

    monitoreo del torre

    Se realizo una visita a la comunidad de Montegrande (Proyecto Piloto de la Torre Hidroneumatica), para verificar su funcionamiento y realizar modificaciones en el tablero automático para evitar problemas por la alta y baja tensión.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Fri 18 Jan 2013, About 11 Years ago

    herramientas de monitoreo

    Se esta analizando diferentes instrumentos y herramientas para la línea de base asi como también para el monitoreo de diferentes componentes y aspectos del proyecto, la meta es que a fin de mes, junto con el informe mensual se presenten distintan herramientas, las cuales se analizaran y se decidirá con cuales se trabajara.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Sun 13 Jan 2013, About 11 Years ago

    reunion con el alcalde para solicitar mas informacion de la comunidad

    Se efectuó una reunión con el alcalde de Santa Rosa Sr. Manuel Yevara, para solicitar un plano de la comunidad, levantamiento topográfico, coordenadas de ubicación de la comunidad. En esta reunión se determino que el municipio nos hara llegar esta informacion la primer semana del mes de febrero.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Wed 09 Jan 2013, About 11 Years ago

    reunion con la prefectura

    Se asistió a una reunión informativa del PROASU JICA, en la cual se presento el proyecto de Nueva America y el tipo de tecnología que se pretendía implementar.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Mon 07 Jan 2013, About 11 Years ago

    preubas de transformador

    Se hicieron pruebas de monitoreo al comportamiento de un transformador similar, para analizar el nuevo contactor y bobina que se utilizara en el tablero para solucionar la posibilidad de un problema por alta y baja tensión.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Fri 04 Jan 2013, About 11 Years ago

    reunion con CRE

    04-01-2012 Se establecio una reunion con CRE, Electrogis (empresa especializada en energia electrica), y San Rafael (empresa encarga de instalacion de bomba y tablero automatico), el motivo de la reunion fue analizar el sistema de energia electrica para el sistema de agua

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Tue 01 Jan 2013, About 11 Years ago

    Reunion con el municipio

    20-12-12 Reunion en oficina de EP con el Alcalde de Santa Rosa Sr. Manuel Yevara, para coordinar terminos del convenio y contraparte para el Proyecto de Nueva America -> Resultado, el alcalde nos hizo llegar una carta de intencion de firma de convenio, donde se compromete a viabilizar la contraparte economica para la ejecucion de dicho proyecto.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Tue 01 Jan 2013, About 11 Years ago

    reunion con CAPyS

    26-12-2012 Reunion con autoridades y miembros del Comite de Agua de Nueva America, para presentacion de proyecto y explicacion de la tecnologia que se va a utilizar -> Resultado, durante el mes de enero se tendra una reunion en la comunidad, en la cual se presentara el presupuesto final y las contrapartes del Municipio y Comunidad.

  • Dilma Rodriguez of Etta Projects
    • confidential
    Implementation Status: in_progress Tue 01 Jan 2013, About 11 Years ago

    reunion entre socios

    24-12-12 Reunion en el Municipio, con Sub Alcalde del Distrito, Presidente del Concejo y Alcalde de Santa Rosa, para iniciar el proceso de presupuetacion de POA para contraparte del Proyecto

This project will provide access to safe, reliable water to 40 families in the village of Nueva America. Project includes water system, formation of training of local water committee and community water & hygiene workshops.

Narrative

This water project utilized a Hydro pneumatic Tower. The Hydro pneumatic Tower was connected to a water distribution system that distributes the water to each of the 42 households. Each family was responsible for assisting in the manual labor necessary to install the water system and financially contribute to the cost of materials necessary for their own domestic connection. Each family has a meter to calculate water usage so that appropriate rates can be applied to ensure sustainability of the system. People of Montegrande elected five villagers to serve on a local Water Committee. Family members use the water system, conserve water, pay their tariffs regularly, and practice healthy hygiene practices. The education program focuses hygienic habits involving hand-washing, food, cooking utensils, water, and latrines. The Department of Basic Sanitation of the Municipality of San Pedro and Etta Projects worked together to offer training to the members of the Water Community and the village at large.

Sustainability

Creating and measuring long-term impact

The maintenance of the system is fairly minimum. The traducer needs to be replaced every 3 to 5 years, and costs $35 US. The traducer can be monitored and replaced when maintaining the pump. Annual operating expenses include: electricity, system accessories, and other tools and administrative materials, totaling $800 per year 

Impact

People Impacted: 200

People Getting Safe Drinking Water: 200

School Children Getting Water: 45

People Getting Sanitation: 200

People Getting Other Benefits: 200

Maintenance/Operating Costs Annual, in US$: $800

Creating and measuring long-term impact

The maintenance of the system is fairly minimum. The traducer needs to be replaced every 3 to 5 years, and costs $35 US. The traducer can be monitored and replaced when maintaining the pump. Annual operating expenses include: electricity, system accessories, and other tools and administrative materials, totaling $800 per year 

Funding

funded:
$12,000
Community:
$3,699
Final Cost:
$12,000

Plan/Proposal