Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by the local Hamlet.

Narrative

Historical Data Imported.

Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by the local Hamlet. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2006 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2006 Preparation Phase

Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by the local Hamlet.

Narrative

Historical Data Imported.

Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by the local Hamlet. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine

Sustainability

Creating and measuring long-term impact

Treatment, , , ,

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: , , ,Groundwater availability,Electro-mechanical (pumps, etc.) Main Reason for Problem: , , , ,Water quantity/quality declined over time

Impact

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type: pressure
Chemicals Added: chlorine
Length of Pipe System (m): 11544
Comments on Status: OK
Comments on Solutions: EMW worked with local hamlet and CPC to select water operators and to upgrade the system in 2013
Notes: OK
Cost in Local Currency: 625607000

Funding

funded:
$29,098
Final Cost:
$29,098
$29,098:
Janet McKinley and George Miller