Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by the local Hamlet.
Narrative
Historical Data Imported.
Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by the local Hamlet. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2006 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2006 Preparation Phase
Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by the local Hamlet.
Narrative
Historical Data Imported.
Helping households from Tam Xuan 2,Nui Thanh in Vietnam access drinking water. The system is managed by the local Hamlet. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine
Sustainability
Creating and measuring long-term impact
Treatment, , , ,
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: , , ,Groundwater availability,Electro-mechanical (pumps, etc.) Main Reason for Problem: , , , ,Water quantity/quality declined over time
Impact
Member Specific Project Data
Water Source: G
Project Type: U
Treatment Type: pressure
Chemicals Added: chlorine
Length of Pipe System (m): 11544
Comments on Status: OK
Comments on Solutions: EMW worked with local hamlet and CPC to select water operators and to upgrade the system in 2013
Notes: OK
Cost in Local Currency: 625607000
Funding
- funded:
- $29,098
- Final Cost:
- $29,098
- edit $29,098:
- Janet McKinley and George Miller