Helping 65 households from Tam Hai,Nui Thanh in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 65 households from Tam Hai,Nui Thanh in Vietnam access drinking water. The system is managed by a local Cooperative.

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2006 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2006 Preparation Phase

Helping 65 households from Tam Hai,Nui Thanh in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 65 households from Tam Hai,Nui Thanh in Vietnam access drinking water. The system is managed by a local Cooperative.

Impact

People Impacted: 275

People Getting Safe Drinking Water: 275

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 2280
Comments on Status: Non operational (this hamlet shared clean water from Hoa Binh system located in Tam Hoa. However, because the source does not have enough water, this system can only provide enough water for beneficiary hamlets in Tam Hoa Commune)
Comments on Solutions:
Notes: Quang Nam Cerwass is changing the water source funded by NTP
Cost in Local Currency: 75250000

Funding

funded:
$3,500
Final Cost:
$3,500
edit $3,500:
Anonymous

Plan/Proposal