Helping 250 households from Loc Binh,Phu Loc in Vietnam access drinking water. The system is managed by a local Cooperative.
Narrative
Historical Data Imported.
Helping 250 households from Loc Binh,Phu Loc in Vietnam access drinking water. The system is managed by a local Cooperative.
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2006 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2006 Preparation Phase
Helping 250 households from Loc Binh,Phu Loc in Vietnam access drinking water. The system is managed by a local Cooperative.
Narrative
Historical Data Imported.
Helping 250 households from Loc Binh,Phu Loc in Vietnam access drinking water. The system is managed by a local Cooperative.
Sustainability
Creating and measuring long-term impact
Other, Surface water quality, , ,
Impact
People Impacted: 1125
People Getting Safe Drinking Water: 1125
Member Specific Project Data
Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 7500
Comments on Status: OK
Comments on Solutions: There is great need for clean water in the commune, so upgrading the system is in need.
Notes:
Cost in Local Currency: 275243000
Funding
- funded:
- $12,802
- Final Cost:
- $12,802
- edit $12,802:
- Janet McKinley and George Miller