Providing facilitation support to Village Water Committees, social mobilisation and awareness generation and capacity building
Narrative
To be completed by CSPC/ SRTT
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2011 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2011 Preparation Phase
-
Divyang Waghela of Coastal Salinity Prevention Cell
- confidential
Implementation Status: completed Fri 30 Apr 2010, Almost 15 Years agoBaseline Study Report
Centre for Intergrated Development, Ahmedabad helped put together a project report on Tata-GE special drinking water supply and sanitation. The report updates the current condition related to water and sanitation in the villages. Major findings of the baseline study are:
a) Demographic details and household pattern
b) Livelihood pattern
c) Water scenario
d) Sanitation, waste management and other amenities
e) Personal hygiene and behavioral aspects
f) Health & Education condition.Detailed report attached in the project ID 344 - http://peerwater.org/projects/344
-
Divyang Waghela of Coastal Salinity Prevention Cell
- confidential
Implementation Status: completed Mon 04 May 2009, Almost 16 Years agoBaseline study launched
The project will cover 10 villages across Mangrol block of Junagadh district and Porbandar block of Porbandar district. A total of about 5000 households (app 25,000 beneficiaries) would be covered across 8 villages.
The major activities planned in each village are:
• Community level capacity building initiatives for construction, operation and maintenance of the RO based drinking water supply units;
• Training and capacity building inputs
• Comprehensive village level drinking water storage and supply network;
• Construction of individual HH level sanitation units, compost pits, soak pits, biogas/ NADEP units / smokeless chullahs.Major expected outcome of the project is to:
• improve access to drinking and domestic water needs through provision of treated potable water & substantial reduction in drudgery and time of women for fetching domestic water.
• Promote improved hygiene and sanitation practices
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
Providing facilitation support to Village Water Committees, social mobilisation and awareness generation and capacity building
Narrative
To be completed by CSPC/ SRTT
Sustainability
Creating and measuring long-term impact
To be completed by CSPC/ SRTT
Other Issues
Unusual and unexpected issues faced during project execution
To be completed by CSPC/ SRTT
Learnings
Knowledge of project and process for sharing
To be completed by CSPC/ SRTT